My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res90 11365
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1990-1999
>
1990
>
Res90 11365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 9:43:08 AM
Creation date
11/23/2005 3:18:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
8/13/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. In contemplation of this Agreement,~City has made <br />arrangements for the concurrent removal of all electric <br />and communication aerial distribution facilities within <br />the District. <br /> <br />5. Pacific is willing to underground its existing aerial <br />communication facilities within the District, subject <br />to the terms and conditions of this Agreement. <br /> <br />In consideration of the above, the parties agree as follows: <br /> <br />C. SPECIFIC PROVISIONS <br /> <br />l. Term <br /> <br />This Agreement is effective upon execution and shall <br />continue in effect until terminated or canceled as <br />provided by law or this Agreement. <br /> <br />2. Tariff <br /> <br />The Project shall be conducted In accordance with the <br />Tariff. <br /> <br />3. Coordination of Project <br /> <br />City shall <br />coordinate <br />District. <br />be limited <br /> <br />prepare all documents necessary to <br />and implement Project plans within the <br />The documents shall include, but shall <br />to; <br /> <br />not <br /> <br />(a) Project Plans and Specifications <br /> <br />~roject plans and specifications shall be prepared <br />in accordance with drawings furnished to City by <br />Pacific; <br /> <br />(b) Delineation of the USS <br /> <br />Project documents shall delineate all USS to be <br />constructed and installed within the District. <br />City will be responsible for the construction and <br />installation of the necessary USS along the public <br />way and along utility rights of way in the <br />District; <br /> <br />(c) Bid Package <br /> <br />City shall prepare a bid package covering the <br />construction and installation of the USS for which <br />City is responsible under the Project. Pacific <br />shall have the right to review the entire bid <br />package prior to the solicitation of bids for the <br />Project. If in Pacific's judgement, the bid <br />exceeds ppcific's estimated amount of $365,000.00, <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.