Laserfiche WebLink
percent of area median income, adjusted for family size at an <br />"affordable rent" including a reasonable utility allowance (as defined <br />in Health & Safety Code Section 50053). <br />All affordable units shall maintain the above noted affordability levels for a period of <br />fifty-five (55) years from the date of initial occupancy. The affordable housing <br />agreement shall specify the number, type, location, size, and phasing of all <br />affordable units, provisions for marketing, income certification and screening of <br />potential renters of units including the financing of ongoing administrative and <br />monitoring costs, consistent with the approved affordable housing plan. <br />Reports and Survevs <br />29. Geotechnical Report - Include a geotechnical field review and reports for all grading <br />work, prepared by a licensed geotechnical engineer and in conformance with <br />Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall <br />be submitted as part of the building permit application. [SDR][ENGINEERING] <br />30. As-Builts — Provide "as -built" or "record" drawings, to be submitted in paper, PDF and <br />AutoCAD formats prior to project sign -off. [COA][ENGINEERING] <br />31. Transportation Demand Management Program — A final Transportation Demand <br />Management (TDM) program, describing the elements to be implemented, shall be <br />reviewed and approved prior to certificate of building occupancy. The TDM program <br />shall include an annual reporting requirement for the first three years that details <br />daytime parking utilization rates and employee use and awareness of the program. <br />Annual reporting shall begin on December 1 of each year. [COA][ENGINEERING] <br />FEMA and Base Flood Elevations <br />32. Finished Floor Elevation (FFE) - The finished floor elevation (FFE) is shown to be <br />10.10 feet, based on NAVD88. FEMA has notified all the municipalities within San <br />Mateo County that new Flood Insurance Rate Maps (FIRMs) will become effective in <br />2018. A portion of the project site is currently located within Zone AE and X, and is <br />within a Special Flood Hazard Area. Upon FEMA's approval of the new maps, the <br />majority of the project will be located within Zone AE, with a base flood elevation of <br />10.00 feet, and is within a Special Flood Hazard Area. Chapter 41 of the City's <br />municipal code and engineering standards require that new construction and <br />substantial improvements to existing structures be built with the lowest finished floor <br />elevation set at or above the base flood elevation, with a recommendation of setting <br />the lowest finished floor elevation 1 foot above the base flood elevation. Chapter 41 <br />of the City's municipal code requires that all building permits and project plans <br />meet the requirements of the FIRM in effect at the time of permit issuance, <br />regardless of when the project was submitted or deemed complete. Although <br />the project will not be required to consider the updated base flood elevations if the <br />building permit has been issued prior to the effective date of the FIRM revisions, the <br />owner may still be subject to FEMA flood insurance requirements based on the <br />elevation certificate filed upon completion of the project. It is recommended that the <br />FFE and any floodproofing be designed to accommodate the new base flood <br />ATTY/RESO.0017/PC RESO ADOPTING THE PLANNED COMMUNITY PERMIT & DENSITY BONUS -353 MAIN ST. <br />REV: 03-01-18 PR <br />Page 11 of 25 <br />