Laserfiche WebLink
Baseline CCTV Inspection Schedule <br />Sewer Basin Sewer Pipelines, Miles <br />Inspection <br />Schedule Inspection Status as of 2017 <br />1 6.21 2008 Complete <br />2 7.61 2009 Complete <br />DT1 12.90 2009 Complete <br />5E 4.53 2010 Complete <br />8 7.91 2010 Complete <br />4 5.87 2012 Complete <br />3 6.44 2011 Complete <br />C04 6.61 2011 Complete <br />5C 3.34 2012 Complete <br />9 3.16 2012 Complete <br />5F 9.93 2013 Complete <br />5B 6.97 2013 Complete <br />6 7.83 2014 Complete <br />5H 3.29 2013 Complete <br />7 11.98 2014 Complete <br />5A 11.98 2015 Complete <br />5D 7.97 2015 Complete <br />5G 9.13 2016 Complete <br />DT2 14.62 2016 Complete <br />TOTAL 148.28 Complete <br />IV-76.2.A. - Page 83