Laserfiche WebLink
Attachment E-1 Contamination Measurement Methodology: Single Loads <br />REV: 03-16-18 MI <br />ATTY/AGR/2018.054/RECOLOGY OF SAN MATEO ATTACHMENT E <br />Page 9 of 14 <br />Appendix 1: Methodology checklist <br />Roles and responsibilities <br />• sampling crew manager—responsible for selecting samples, working with <br />Facility staff and the sampling crew, quality control, and compliance with <br />Facility regulations. <br />• sampling crew—responsible for sorting samples. <br />• facility manager—responsible for coordinating with the sampling crew <br />manager, SBWMA, and drivers. <br />• tipping floor staff—responsible for identifying loads potentially contaminated <br />beyond the acceptable threshold, creating a designated sampling and sorting <br />area, and ensuring segregation of selected loads in that area. <br />• loader operator(s)—responsible for segregating the selected load from other <br />loads in the designated sampling and sorting area. <br /> <br /> Advanced preparation <br /> Project manager: <br /> Contact facility manager <br /> Ask facility manager to update the following employees with the <br />sampling plan: <br /> Loader operator(s) <br /> Tipping floor staff <br /> Request safety expectations <br /> Schedule safety training <br /> Ask if there are any circumstances that may affect the study (i.e., <br />weather, animals, site construction, etc.) <br /> Obtain safety gear (Appendix 3) <br /> Check safety gear <br /> Obtain sorting equipment (Appendix 3) <br /> Check sorting equipment <br /> Print tally sheets (Appendix 2) <br /> Print on "Rite in the Rain" all-weather paper <br /> Sampling crew and sampling crew manager <br /> Review material list <br /> Review data collection forms <br /> Review unique site requirements <br /> <br /> Arrival at Facility <br /> Sampling crew: <br /> Arrive at Facility ahead of schedule <br /> Participate in any required safety training <br /> Don safety gear <br /> Sampling crew manager: <br /> Arrive at Facility ahead of schedule <br /> Reviews logistics and expectations with MRF manager <br /> Participate in any required safety training <br /> Don safety gear <br /> <br />6.2.B. - Page 170