My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-03-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-03-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:02:20 PM
Creation date
3/22/2018 4:45:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/26/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
931
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT I <br />PERFORMANCE INCENTIVES AND DISINCENTIVES <br />REV: 03-16-18 MI <br />ATTY/AGR/2018.054/RECOLOGY OF SAN MATEO ATTACHMENT I <br />Page 4 of 8 <br />Contractor shall receive an incentive payment if the calculated Overall Diversion <br />Level achieved by Contractor in any given Rate Year exceeds the arithmetic <br />average of the calculated Overall Diversion Levels for the five (5) Rate Years prior <br />to the Rate Year under consideration. The incentive payment for Rate Year Eleven <br />(2021) shall equal seventy dollars ($70.00) per Ton for each Ton over that <br />threshold. In subsequent Rate Years, the per-Ton incentive payment amount shall <br />be adjusted by the Annual Index Change in the CPI-U, which is described in <br />Attachment K. <br />For example, when assessing the potential for an incentive payment for completed <br />Rate Year Sixteen, the Rate Year Sixteen Overall Diversion Level shall be <br />compared to the average of the calculated Overall Diversion Level for Rate Years <br />Eleven, Twelve, Thirteen, Fourteen, and Fifteen. <br />Continuing the example, if the calculated Overall Diversion Levels for Rate Years <br />Eleven through Fifteen were 36.5%, 36.7%, 36.8%, 36.9% and 37.1%, <br />respectively, then the arithmetic average over such five (5) Rate Year period would <br />be 36.8%. This is the threshold that Contractor would need to exceed in Rate Year <br />Sixteen to earn an incentive payment. <br />If in Rate Year Sixteen the Contractor Collected the Tonnages set forth in Table 2 <br />above, then the amount of the performance incentive would be calculated as <br />follows: <br />Total Tons of material actually Collected: 422,200 <br />Tons of Recyclable Material* required <br />to be Collected to meet threshold: 155,370 (= 422,200 x <br />0.368) <br />Tons of Recyclable Material* actually Collected: 156,200 <br />Amount by which Contractor exceeded threshold: 830 (= 156,200 – <br />155,370) <br />Incentive payment: $58,100 (= 830 x <br />$70.00)** <br />* For purposes of this calculation, Recyclable Materials Collected shall include the <br />sum of Targeted Recyclable Materials, Other Recyclable Materials, and Organic <br />Materials Collected, without adjusting for Contamination pursuant to the definition <br />of “Overall Diversion Level” in Attachment A. <br />** For simplicity purposes, $70 per Ton has been used in this calculation; however, <br />it is the amount for Rate Year Eleven (2021). The amount for Rate Year Sixteen <br />would equal $70 per Ton adjusted annually by the Annual Index Change in the <br />CPI-U. <br />Minimum Diversion Level Requirements <br />Minimum Single-Family Diversion Level <br />Contractor shall be assessed a Disincentive Payment if the calculated Single- <br />Family Diversion Level in any given Rate Year is less than the arithmetic average <br />of the calculated Single-Family Diversion Levels for the five (5) Rate Years prior to <br />6.2.B. - Page 187
The URL can be used to link to this page
Your browser does not support the video tag.