My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-03-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-03-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:02:20 PM
Creation date
3/22/2018 4:45:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/26/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
931
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
At tachment J <br />Liquidated Damages <br />REV: 03-16-18 MI <br />ATTY/AGR/2018.054/RECOLOGY OF SAN MATEO ATTACHMENT J <br />Page 11 of 13 <br />TABLE 1 <br /> Event of Non- <br />Performance <br />Acceptable Performance Level Definition of Complaint, Incident, or <br />Event <br />Tracking Method Liquidated <br />Damage <br />Amount <br />2. Submittal of <br />Inaccurate Report, <br />Application, <br />Proposal, or Other <br />Submittals and <br />Correspondence <br />Report, application, proposal or <br />correspondence submitted does not <br />contain inaccurate, misleading or <br />erroneous data and information. <br />For each day Contractor fails to submit <br />corrections or restatements rectifying the <br />inaccurate, misleading or erroneous data <br />and information contained in reports, <br />applications, proposals or <br />correspondence submitted to Agency or <br />SBWMA commencing with the third (3rd) <br />Business Day after receiving notification <br />from Agency or SBWMA of Contractor <br />having submitted inaccurate, misleading <br />or erroneous data and information. <br /> <br />The data and <br />information <br />contained in <br />Contractor’s <br />submittal shall be <br />recorded and <br />verified for <br />accuracy by <br />Agency or <br />SBWMA. <br />$250 per day <br />for each day <br />inaccurate or <br />erroneous <br />information is <br />not corrected <br />by Contractor <br />commencing <br />with the third <br />(3rd) Business <br />Day after <br />receiving <br />notification <br />from Agency or <br />SBWMA of <br />Contractor <br />having <br />submitted <br />inaccurate, <br />misleading or <br />erroneous data <br />and information <br />3. Failure to Perform <br />and Report on <br />Billing Review <br />Reports on billing reviews are submitted <br />on time. <br />Failure to conduct Billing reviews and <br />report on the findings of the review <br />pursuant to Section 7.01.F. <br />Contractor’s <br />submittal dates <br />shall be recorded <br />and compared to <br />the submittal <br />requirements of <br />the Agreement <br />$250 per day <br />for each day <br />report is <br />overdue 6.2.B. - Page 202