My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-03-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-03-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:02:20 PM
Creation date
3/22/2018 4:45:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/26/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
931
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0020/CC RESO APPROVING & RE CERTIFIYING 2018 REVISED SEWER SYSTEM MANAGEMENT PLAN <br />REV: 03-16-18 MI <br />Page 1 of 1 <br />RESOLUTION NO.______ <br />RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY <br />APPROVING AND RE-CERTIFYING THE 2018 REVISED SEWER SYSTEM <br />MANAGEMENT PLAN <br /> <br /> WHEREAS, the State Water Resources Control Board (SWRCB) adopted Order No. 2006- <br />0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems <br />(GWDR) dated May 2, 2006, and Order No. WQ-2008-0002-EXEC dated February 20, 2008, to <br />regulate all sanitary sewer collection systems greater than one mile in length that discharge to a <br />publicly owned sewage treatment facility; and <br /> <br />WHEREAS, the SWRCB issued Order No. 2013-0058-EXEC, effective September 9, <br />2013, amending the Monitoring and Reporting Program (MRP) elements of the GWDR; and <br /> <br />WHEREAS, the City of Redwood City as the owner and operator of the City’s sanitary <br />sewer collection system, which serves a population of approximately 85,601 across 19 square <br />miles and discharges from the City’s collection system to Silicon Valley Clean Water Wastewater <br />Treatment Plant, is an enrollee under the GWDR; and <br /> <br />WHEREAS, the GWDR requires that an enrolled sanitary sewer collection system prepare <br />and implement a Sewer System Management Plan (SSMP) documenting the enrollee’s program <br />to properly operate and maintain its sanitary sewer system, and that the governing body approve <br />significant updates to the SSMP; and <br /> <br />WHEREAS, the City Council adopted the SSMP on March 23, 2009 and staff have made <br />periodic updates to the SSMP; and <br /> <br />WHEREAS, staff has updated the City’s 2018 SSMP with the assistance of Causey <br />Consulting in conformance with the GWDR and MRP requirements and with significant updates <br />to the SSMP sub plans. <br /> <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />REDWOOD CITY, CALIFORNIA, AS FOLLOWS: <br /> <br />1. The City Council hereby approves and re-certifies the revised 2018 SSMP. <br /> <br />2. This resolution shall be effective upon its date of adoption. <br /> <br /> * * * <br /> <br />6.2.A. - Page 3
The URL can be used to link to this page
Your browser does not support the video tag.