Laserfiche WebLink
<br />EXHIBIT IIAII <br /> <br />8-Nov-05 <br /> <br />pJ <br /> <br />COST OF SERVICES <br /> <br />COST PROPOSAL TO CITY OF REDWOOD CITY SANITARY DISTRICT <br />TO: GRACE LE <br />Email GLe@redwoodcitV.orq <br />GRACE LE <br />CITY OF REDWOOD CITY <br />ENGINEERING & CONSTRUCTION <br />(650> 780-7258 <br />(650> 780-7309 <br /> <br />Tel: <br />Fax: <br /> <br />1900 Powell Street <br />Suite 250 <br />Emeryville, CA <br />94608-1812 <br />Tel: (510) 652-1164 ext 727 <br />Fax: (510) 652-5604 <br />www.E2.com <br />Jeff.Blum@e2.com <br /> <br />From: <br /> <br />Jeff Blum <br /> <br />SCOPE: Task 1 <br /> <br />Install 7 depth and velocity flow meters for 1 month period <br />and calibrate flow meter. Includes site verification, one day installation, one day <br />and removal. Meters will be checked weekly to collect calibration points. <br />and for maintenance. Report will include site sheets, hourly hydrographs and tables. <br /> <br />EXPENSES: First Month Additional Weekly cost <br /> Amount <br />Item Rate Units Used Cost <br />van $80 day 5 $400 $80 <br />mileage $0.46 mile 300 $138 $21 <br />Flow Meter DV * $750 1 Month 7 $5,250 $1,313 <br />Velocity probe $35 day 5 $175 $35 <br />Gas detector $35 day 5 $175 $35 <br />Rain Gauges $200 month 1 $200 $50 <br />Shipping $200 1 $200 $0 <br />ppe $25 day 5 $125 $25 <br />TOTAL $6,663 <br />LABOR Rate Hours Cost <br />P.M. $110 7 $770 $110 <br />CREW CHIEF $75 47 $3,525 $300 <br />TEC.1 $65 47 $3,055 $260 <br />TEC.2 $55 39 $2,145 $220 <br />DATA ANALYSES <br />P.M. $110 42 $4,620 <br />TEC.1 $55 21 $1,155 $55 <br />Report 2 copies $100 1 $100 <br />TOTAL $15,370 <br /> <br />$1,559 <br /> <br />$945 <br /> <br />TOTAL COST <br />Total For Two Months <br />Total For Three Months <br />Total For Four Months <br /> <br />First Month <br /> <br /> <br />Additional <br />week <br /> <br />$2,504 <br /> <br />In the intrest of saving money for the client E2 maybe able to reduce site weekly visits after the first month. <br />That is if there are no problem sites: bad flow hydraulics, debris and weather is about the same. <br />Each site visit Labor and equipment cost is $1,760 <br />