My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Funding is requested for ongoing improvements to water quality, <br />circulation, and serviceability of the Redwood Shores storm drainage <br />system, including the lagoon. The proposed budget is $200,000. <br /> <br />VII. Sewer <br />· Collection System Replacement <br />Approximately $3.8 million is proposed for annual replacement and <br />rehabilitation of the sewer collection system. <br />· Sewer Pump Station Rehabilitation Program <br />This project funds regular improvements to the City’s 31 sewer lift stations. <br />Lift stations 13 and 16 are currently under construction, stations 18 and 20 <br />are under design, and funding is requested to prepare the next round of <br />station rehabilitation. The proposed budget is $1.6 million. <br />· Sequoia Station Groundwater Mitigation <br />Staff have been working with the Regional Water Resources Control <br />Board to remediate groundwater beneath the Sequoia Station Shopping <br />Center. A pilot study will be conducted in FY 2017-18, and funding is <br />requested for continued monitoring and eventual full-scale remediation of <br />the site in future years. The proposed budget is $500,000. <br /> <br />VIII. Storm water <br />· Bayfront Canal Cordilleras Cleanup <br />$100,000 is proposed for channel maintenance at Bayfront Canal and <br />Cordilleras Creek in FY 2018-19. Channel maintenance maintains the flow <br />capacity of the two drainage channels and allows for efficient storm water <br />transport. <br /> <br />IX. Technology <br />· Finance and Human Resources Software <br />Additional funding of $1 million is proposed in FY 2018-19 as updated cost <br />projections place the project cost at around $3.5 million. Staff has <br />released a request for proposals and will select and begin implementation <br />of the new software next fiscal year. <br />· Technology Infrastructure and Application Support <br />$500,000 is requested to maintain critical hardware, software, and <br />subscriptions for City operations. Planned projects for next fiscal year <br />include computer replacement, licensing and maintenance of city-wide <br />application systems, and infrastructure equipment maintenance. <br /> <br /> <br />9.A - Page 7
The URL can be used to link to this page
Your browser does not support the video tag.