Laserfiche WebLink
  <br />  <br />  <br />JEFFERSON GARAGE ELEVATOR REPLACEMENT  <br />PARKING  <br />PROJECT DESCRIPTION  <br />Current elevator along the Theater Way side of the Jefferson Garage  <br />was under designed for the occupancy load that it sees.  For the past  <br />year due to running excessive loads the elevator has seen increasing  <br />outages and been non‐operational for periods.  In some  <br />circumstances patrons have become stranded in the elevator briefly.   <br />The project would fully replace the elevator with one with suitable  <br />capacity for current and future demands.  <br />PROJECT BENEFITS  <br /> Increased reliability of access  <br /> This elevator is the main access that accessible patrons use to access Theater Way when they park at the Jefferson  <br />Garage  <br />PROJECT STATUS  <br />  <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />MM/YYYY    MM/YYYY  MM/YYYY    MM/YYYY MM/YYYY    MM/YYYY <br />  <br />PROJECT ESTIMATES  <br />   REQUESTED BUDGET 5 – Year Future <br />FUND   2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />681       $750,000   $0 $0 $0 $0  $750,000  <br />      <br />Total       $750,000   $0 $0 $0 $0  $750,000  <br />  <br />9.A - Page 59