Laserfiche WebLink
  <br />  <br />  <br />REDWOOD SHORES LAGOON CIRCULATION SYSTEM (83169)  <br />REDWOOD SHORES  <br />  <br />PROJECT DESCRIPTION  <br />The work consists of improving water quality, circulation and  <br />serviceability of the Redwood Shores storm drainage system that  <br />includes the lagoons. It will also include silt removal and dredging,  <br />improvements of intakes and outfalls, rehabilitation of existing discharge  <br />facilities, installation of a new pump station and water quality  <br />monitoring of the lagoon to improve water quality.  <br />  <br />   <br />PROJECT BENEFITS  <br /> The program aims to improve the water quality within the lagoons by improving flow circulation and management of  <br />the Redwood Shores Lagoons.    <br />PROJECT STATUS  <br />Completed the Redwood Shores Lagoon Management Program and preparing RFP for potential Redwood Shores Lagoon  <br />water‐quality management capital improvement measures projects.  <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />04/2018    07/2018  08/2018  07/2019 08/2019    03/2020 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357  $84,476    $0  $300,000 $50,000 $2,000,000 $250,000  $2,600,000 <br />216   $200,000 $200,000 <br />Total      $200,000  $300,000 $50,000 $2,000,000 $250,000  $2,800,000 <br />  <br />   <br />9.A - Page 76