My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />PUMP & CONTROLS REPLACE. PROG. (75073) <br />SEWER <br />PROJECT DESCRIPTION <br />This project provides funding for replacement pumps at the City’s <br />sewer lift stations. There are approximately 31 sewer lift stations <br />located throughout the city that transfer wastewater to the <br />wastewater treatment plant in Redwood Shores. Each lift station is <br />equipped with at least two pumps for increased reliability, and lift <br />stations are connected to the City’s Supervisory Control and Data <br />Acquisition (SCADA) communication system. As pumps age beyond <br />their useful life, replacement pumps are purchased and installed. This <br />CIP project provides funding to periodically upgrade and replace <br />mechanical and electronic equipment at the lift stations. <br />LOCATION DESCRIPTION: <br />Citywide <br /> <br />PROJECT BENEFITS <br /> Timely replacement minimizes the risk of unexpected failure and the potential for sanitary sewer overflows. <br /> Increases the overall reliability of the sanitary sewer collection system. <br />PROJECT STATUS <br />Lift stations are inspected annually and repairs and replacements scheduled as appropriate. <br /> <br />PROJECT SCHEDULE <br />This is an ongoing project. <br /> <br /> <br /> <br />PROJECT ESTIMATES <br /> BALANCE REQUESTED BUDGET 5 – Year Future <br />FUND As of <br />04/2018 <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />689 $44,187 $80,000 $80,000 $80,000 $80,000 $80,000 $400,000 <br /> <br />Total $80,000 $80,000 $80,000 $80,000 $80,000 $400,000 <br /> <br />9.A - Page 81
The URL can be used to link to this page
Your browser does not support the video tag.