Laserfiche WebLink
  <br />  <br />  <br />PUMP & CONTROLS REPLACE. PROG. (75073)  <br />SEWER  <br />PROJECT DESCRIPTION  <br />This project provides funding for replacement pumps at the City’s <br />sewer lift stations.  There are approximately 31 sewer lift stations  <br />located throughout the city that transfer wastewater to the  <br />wastewater treatment plant in Redwood Shores. Each lift station is  <br />equipped with at least two pumps for increased reliability, and lift  <br />stations are connected to the City’s Supervisory Control and Data  <br />Acquisition (SCADA) communication system. As pumps age beyond  <br />their useful life, replacement pumps are purchased and installed. This  <br />CIP project provides funding to periodically upgrade and replace  <br />mechanical and electronic equipment at the lift stations.   <br />LOCATION DESCRIPTION:  <br />Citywide  <br />  <br />PROJECT BENEFITS  <br /> Timely replacement minimizes the risk of unexpected failure and the potential for sanitary sewer overflows.   <br /> Increases the overall reliability of the sanitary sewer collection system.  <br />PROJECT STATUS  <br />Lift stations are inspected annually and repairs and replacements scheduled as appropriate.  <br />  <br />PROJECT SCHEDULE  <br />This is an ongoing project.  <br />  <br />           <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />689  $44,187     $80,000    $80,000  $80,000  $80,000  $80,000    $400,000  <br />       <br />Total       $80,000    $80,000  $80,000  $80,000  $80,000    $400,000  <br />   <br />9.A - Page 81