My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />BAYFRONT WATERSHED MGMT & HABITAT RESTORATION <br />(83181) <br />STORMWATER <br />PROJECT DESCRIPTION <br />Bayfront Canal and Atherton Channel collect stormwater from six <br />drainage basins and discharges through a single outlet to the Bay. <br />During storms that coincide with high tides, the Canal and Channel <br />cannot discharge stormwater due to hydraulic constraints and can <br />cause flooding in surrounding neighborhoods. To improve the flooding <br />situation, the City and other agencies propose utilizing salt ponds R5 <br />and S5 at the Don Edwards National Wildlife Refuge as temporary <br />detention ponds during high tides. <br /> <br /> <br /> <br /> <br />PROJECT BENEFITS <br /> <br />PROJECT STATUS <br />On October 2, 2017, Council authorized execution of a MOU with San Mateo County, Atherton and Menlo Park on a cost <br />sharing for collaborative efforts to provide watershed evaluation and design improvements to reduce flooding on the <br />Bayfront Canal and Atherton Channel. The project is currently undergoing watershed planning and design. Construction is <br />expected to occur in the Spring of 2019 and after regulatory permits are obtained. <br />PROJECT SCHEDULE <br /> <br />Planning Design Construction <br />10/2017 06/2018 10/2017 09/2018 02/2019 12/2019 <br /> <br />PROJECT ESTIMATES <br /> BALANCE REQUESTED BUDGET 5 – Year Future <br />FUND As of <br />04/2018 <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357 $5,249,316 $0 $0 $0 $0 $0 $0 <br /> <br />Total $0 $0 $0 $0 $0 $0 <br /> <br />9.A - Page 88
The URL can be used to link to this page
Your browser does not support the video tag.