Laserfiche WebLink
  <br />  <br />  <br />BAYFRONT WATERSHED MGMT & HABITAT RESTORATION  <br />(83181)  <br />STORMWATER  <br />PROJECT DESCRIPTION  <br />Bayfront Canal and Atherton Channel collect stormwater from six  <br />drainage basins and discharges through a single outlet to the Bay.  <br />During storms that coincide with high tides, the Canal and Channel  <br />cannot discharge stormwater due to hydraulic constraints and can  <br />cause flooding in surrounding neighborhoods. To improve the flooding  <br />situation, the City and other agencies propose utilizing salt ponds R5  <br />and S5 at the Don Edwards National Wildlife Refuge as temporary  <br />detention ponds during high tides.  <br />  <br />  <br />  <br />  <br />PROJECT BENEFITS  <br />  <br />PROJECT STATUS  <br />On October 2, 2017, Council authorized execution of a MOU with San Mateo County, Atherton and Menlo Park on a cost  <br />sharing for collaborative efforts to provide watershed evaluation and design improvements to reduce flooding on the  <br />Bayfront Canal and Atherton Channel.  The project is currently undergoing watershed planning and design.  Construction is  <br />expected to occur in the Spring of 2019 and after regulatory permits are obtained.  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />10/2017    06/2018  10/2017 09/2018 02/2019    12/2019 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357  $5,249,316    $0 $0 $0 $0 $0  $0 <br />     <br />Total      $0 $0 $0 $0 $0  $0 <br />  <br />9.A - Page 88