Laserfiche WebLink
  <br />  <br />  <br />ADA RAMP PROGRAM (72583)        <br />TRANSPORTATION  <br />PROJECT DESCRIPTION  <br />Install Americans with Disabilities Act (ADA)‐compliant curb ramps as  <br />required by law and in response to resident requests. Recent case law  <br />has required the installation of ADA‐compliant curb ramps with roadway  <br />reconstruction, overlays, and cape seals.  <br />LOCATION DESCRIPTION:  <br />Citywide  <br />  <br />PROJECT BENEFITS  <br /> Complies with Americans with Disabilities Act (ADA).   <br /> Improves access to sidewalks.   <br /> Reduces overall costs by increasing unit quantities.  <br />PROJECT STATUS  <br />$400,000.00 every other year fund is approved for 2017/2018 & 2019/2020 to install new curb ramps, a requirement for  <br />overlay and cape seal projects. The 2017/2018 projects won't need many ramps, but we estimate building ~120 curb ramps  <br />($800,000) with the cape seal project the following year.  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />01/2017    03/2017  04/2017 05/2017 06/2017    09/2017 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />285  $20,000     $50,000  $50,000  $50,000  $50,000     $200,000  <br />357 $280,000   $‐$280,000 $280,000   $560,000  <br />Total      $50,000 $330,000 $50,000 $330,000   $760,000 <br />  <br />9.A - Page 107