Laserfiche WebLink
  <br />  <br />  <br />DWNTWN TRANSIT IMPR/STREETCAR STUDY (75604)  <br />TRANSPORTATION  <br />  <br />PROJECT DESCRIPTION  <br />Conduct a feasibility study of the potential Broadway Streetcar line and  <br />upgrades to the Downtown Transit Center.    <br />  <br />The design studies for the Transit Center would examine pedestrian,  <br />shuttle, taxi, and bicycle connections as well as train platform  <br />improvements and efficiencies in the parking lots around the Center.  <br />  <br />The feasibility study for the potential Broadway Streetcar line would  <br />include an economic and design analysis for the feasibility of a streetcar  <br />or urban circulator running along Broadway from the Downtown Transit  <br />Center to the Stanford in Redwood City Project.  <br />  <br />PROJECT BENEFITS  <br /> Improve mobility options by improving existing modes of transit in the Transit Center  <br /> Connect outlying areas to the Downtown through the potential streetcar line  <br />PROJECT STATUS  <br />  <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />MM/YYYY    MM/YYYY  MM/YYYY MM/YYYY MM/YYYY    MM/YYYY <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />264  $23,731     $0  $0 $0 $0 $0   $0  <br />285 $0   $0 $300,000 $0 $0 $0 $300,000  <br />357  $0     $0  $200,000  $0 $0 $0  $200,000 <br />      <br />Total      $0  $500,000 $0 $0 $0  $500,000 <br />   <br />9.A - Page 117