Laserfiche WebLink
  <br />  <br />  <br />MEAS A (101/84 HWY INTERCHANGE) (83172)  <br />TRANSPORTATION  <br />PROJECT DESCRIPTION  <br />Reconstruction of the existing US 101/Woodside Road interchange to ease  <br />congestion, increase safety, and improve access for pedestrians and  <br />cyclists across Woodside Road and Highway 101.  <br />  <br />PROJECT BENEFITS  <br /> Relieves existing and future traffic congestion.  <br /> Increases traffic safety.  <br /> Removes barriers for people walking and biking.  <br />PROJECT STATUS  <br />Design and ROW underway. Environmental document approved in December 2016.   <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />01/2010    12/2016  01/2017  04/2020 10/2020    10/2023 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />262  $0    $420,000   $0 $0 $0 $0   $420,000  <br />264 $1,898,805  $0 $0 $0 $0 $0  $0   <br />285  $306,103    $0  $0 $0 $0 $0   $0  <br />357 $682,557  $0  $3,580,000 $22,000,000 $0 $0 $25,580,000  <br />Total      $420,000  $3,580,000 $22,000,000 $0 $0  $26,000,000 <br />  <br />9.A - Page 121