My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />SUBSTANDARD STREET IMPROVEMENT PROGRAM <br />TRANSPORTATION <br />PROJECT DESCRIPTION <br />The City has older streets such as Jefferson Avenue, Oakwood Boulevard, <br />and various short dead‐end segments that were not constructed with <br />curb, gutter, sidewalk or drainage facilities. Because of this, the City has <br />assumed a limited maintenance responsibility over these streets until they <br />are brought up to current street standards. Past practice has been to <br />fund these improvements through assessment districts which include the <br />benefiting properties. <br /><<GIS LOCATION MAP>> <br /> <br />LOCATION ADDRESS/DESCRIPTION: <br /> <br />PROJECT BENEFITS <br /> Improves the roadway quality in existing residential areas with substandard streets. <br /> Improves drainage and paved parking areas. <br /> Provides separated pedestrian facilities. <br />PROJECT STATUS <br />Conceptual. <br />PROJECT SCHEDULE <br /> <br />Planning Design Construction <br />MM/YYYY MM/YYYY MM/YYYY MM/YYYY MM/YYYY MM/YYYY <br /> <br />PROJECT ESTIMATES <br /> REQUESTED BUDGET 5 – Year Future <br />FUND 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />357 $100,000 $5M $35M $35M $35M $110.1M <br /> <br />Total $100,000 $5M $35M $35M $35M $110.1M <br /> <br /> <br />9.A - Page 131
The URL can be used to link to this page
Your browser does not support the video tag.