Laserfiche WebLink
  <br />  <br />  <br />WHIPPLE GRADE SEPARATION  <br />TRANSPORTATION  <br />PROJECT DESCRIPTION  <br />Whipple Avenue crosses the Caltrain corridor near the intersection of  <br />Whipple and El Camino Real.  Of the City's six at‐grade railroad  <br />crossings on the corridor, Whipple sees the highest volume of traffic.  A  <br />Whipple Avenue grade separation will physically separate railroad  <br />tracks from vehicular, bicycle and pedestrian roadway users by  <br />changing the grade of the railroad tracks and/or affected roadways.  <br />PROJECT BENEFITS  <br /> Increases safety for all roadway users.  <br /> Reduces traffic delays due to train crossings.  <br />PROJECT STATUS  <br />Footprint study was completed in 2009, planning and design have not begun yet. Alternatives analysis is the next step. <br />  <br />PROJECT SCHEDULE  <br />  <br />Planning Design Construction <br />07/2017    06/2018  07/2018  06/2021 07/2022    06/2023 <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />01/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />264  $763,936     $750,000   $3,750,000  $‐ $7,500,000   $‐   $12,000,000  <br />      <br />Total       $750,000   $3,750,000  $‐ $7,500,000   $‐   $12,000,000  <br />  <br />9.A - Page 140