My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />CATHODIC PROTECTION PROGRAM (74163) <br />WATER <br /> <br />PROJECT DESCRIPTION <br />The purpose of this program is to extend the life of key metallic water <br />transmission pipelines by improving their existing corrosion protection <br />system. The projects would interconnect the pipes electrically and install <br />additional cathodic protection measures to meet national standards for <br />corrosion protection. <br />LOCATION DESCRIPTION: <br />Citywide <br /> <br />PROJECT BENEFITS <br /> Extends the life of key metallic water pipes. <br /> Ensures the continued service reliability of the water distribution system. <br /> Improves water quality and fire protection. <br />PROJECT STATUS <br />This is an ongoing program. Projects are typically planned and designed in the winter and constructed in the spring/fall. <br />The construction cycle would repeat next year with minor variations depending on staff workload and funding. <br />PROJECT SCHEDULE <br />This is an ongoing program. <br />Planning Design Construction <br />Winter Spring Fall Spring Spring Fall <br /> <br />PROJECT ESTIMATES <br /> BALANCE REQUESTED BUDGET 5 – Year Future <br />FUND As of <br />04/2018 <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />686 $117,222 $10,000 $100,000 $100,000 $100,000 $100,000 $410,000 $100k/yr <br /> <br />Total $10,000 $100,000 $100,000 $100,000 $100,000 $410,000 <br /> <br />9.A - Page 144
The URL can be used to link to this page
Your browser does not support the video tag.