Laserfiche WebLink
  <br />  <br />  <br />RECYCLED WATER DISTRIBUTION PUMP STATION  <br />IMPROVEMENTS  <br />WATER  <br />  <br />  <br />PROJECT DESCRIPTION  <br />1. Replace and reprogram existing controller hardware which is no longer  <br />supported, and correct logic issues with pump station programming and  <br />improve interface with Silicon Valley Clean Water.  <br />2. Extend potable water backup supply and air gap to provide potable  <br />supply directly to the pump station in the event non‐compliant water is  <br />delivered.  <br />3. Construct an enclosure around the distribution box to prevent  <br />contaminants from entering recycled water during production.  <br />  <br />PROJECT BENEFITS  <br /> Improves reliability of the recycled water system.  <br /> Improves operational efficiency.  <br /> Decreases maintenance requirements.  <br />PROJECT STATUS  <br />This is a new project.  <br />PROJECT SCHEDULE  <br />The project schedule is to be determined.  <br />Planning Design Construction <br />          <br />  <br />PROJECT ESTIMATES  <br />   REQUESTED BUDGET 5 – Year Future <br />FUND   2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />686       $0  $200,000  $0 $0 $0  $200,000  <br />      <br />Total       $0  $200,000  $0 $0 $0  $200,000  <br />  <br />  <br />   <br />9.A - Page 149