  <br />  <br />  <br />WATER SYSTEM MISCELLANEOUS EQUIPMENT REPLACEMENT  <br />(74593)  <br />WATER  <br />PROJECT DESCRIPTION  <br />This project is for replacement of existing water system equipment  <br />including pumps, motors, and pressure control valves to enhance  <br />efficiency and improve system reliability.  <br />LOCATION DESCRIPTION:  <br />Citywide  <br />  <br />PROJECT BENEFITS  <br /> Improve water system efficiency and reliability.   <br />PROJECT STATUS  <br />Pump stations are inspected annually and repairs and replacements scheduled as appropriate.  <br />  <br />PROJECT SCHEDULE  <br />This is an ongoing project.  <br />  <br />           <br />  <br />PROJECT ESTIMATES  <br /> BALANCE  REQUESTED BUDGET 5 – Year Future <br />FUND As of  <br />04/2018  <br /> 2018/19 2019/20 2020/21 2021/22 2022/23 Total Years <br />686  $19,490     $100,000    $100,000  $100,000  $100,000  $400,000  <br />       <br />Total       $100,000    $100,000  $100,000  $100,000  $400,000  <br />  <br />9.A - Page 154