My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPRIETARY & CONFIDENTIAL WWW.RECURRENTENERGY.COM <br />•150 MWac solar PV project <br />–100 MWac delivered to PCE starting 2019 <br />•Located in Kings County, CA <br />•Connects into Mustang Switching Station <br />(built by Recurrent Energy for PG&E) <br />•Site control and executed interconnection <br />agreement <br />•Executed 5-craft Project Labor Agreement <br /> <br />MUSTANG TWO SOLAR PV PROJECT <br />RECURRENT ENERGY <br />12 <br />•Conditional Use Permit (CUP) under <br />review; expected in Q1 2018 <br />•Construction will begin 2018; <br />commercial operation in 2019 <br />•Estimated 400 peak construction jobs <br />•1 operating project nearby; 1 <br />additional project in development in <br />the same location <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.