Laserfiche WebLink
Estimated hour and fees per task are delineated in the chart below. <br />'ask <br />Task Description <br />Estimated Task <br />Estimated Total Task <br />Subtotal <br /># <br />Hours _ <br />Fees <br />Fees <br />Hold Meetinas with Citv Staff: Hold a sufficient number of <br />1 <br />meetings with staff representatives from City Departments <br />20 <br />$3,420.00 <br />occupying City Hall in order to identify security and access <br />control and related operational concerns. <br />Desian Securitv'Portals': Design security "Portals" and <br />2 <br />other structures that limit access to staff -occupied areas to <br />56 <br />$9,520.00 <br />authorized persons. <br />Retain Public Access: Retain public access in order to <br />3 <br />conduct business and hold community meetings/gatherings <br />6 <br />$1,020.00 <br />whenever the building is open. <br />Evaluate Public Gatheripy Areas: Evaluate public <br />4 <br />gathering areas in City Hall to reduce/eliminate unauthorized <br />8 <br />$1,360.00 <br />use and nuisance problems. <br />Ensure Emergp-ncv end Disability, Access: Ensure <br />5 <br />emergency and disabrl'ity access and compliance with all <br />12 <br />$2,040.00 <br />federal, state and local building codes. <br />Maintain Overall Inteoration: Maintain overall integration of <br />6 <br />building functions/usesand avoiding 'bottlenecks'in <br />8 <br />$1,360.00 <br />circulation patterns. <br />Prepare Floor Plans and 3D Representaff'fpns: Prepare <br />7 <br />floor plans, schematic drawings and three-dimensional <br />89 <br />$14,030.00 <br />representations of design options. <br />8 <br />Prepare Cost Estimate: Prepare cost estimates for design <br />12 <br />$2,040.00 <br />options. <br />Present Desian ODtions: Present design options at a <br />9 <br />meeting of departmental representatives and a separate <br />6 <br />$1,020.00 <br />meeting of the City Council. <br />Revise and Finalize Preferred Des)pn: Revise and finalize <br />10 <br />a preferred design based upon input from the departmental <br />24 <br />$3,696.00 <br />and City Council meetings. <br />11 <br />Prepare Construction D men and Cost Estimates: <br />60 <br />$9,512.00 <br />$49,018.00 <br />Prepare construction drawns and project cost estimates. <br />g <br />Page 12 of 12 <br />REV: 0412-18 MI <br />ATTY/AGR.2018.083/The Crosby Group -- Engineers and Architects <br />