Laserfiche WebLink
18. Tree Removal Permit -Obtain a Tree Removal Permit for the removal and tree trimming <br />of all ordinance -size trees (number, type and location) defined within the City's Tree <br />Preservation Ordinance prior to building permit issuance. [SDR] [PLANNING] <br />19. Street Trees - Street trees (24 -inch box) shall be planted along Maple Street and the <br />entire length of the proposed Blomquist Street frontages. The tree species and location <br />will be determined by the City Engineer and Planning Manager. These improvements <br />shall be included as part of the building permit submittal package. Newly planted trees <br />shall be both irrigated by the applicant. [SDR] [PLANNING] <br />20. Stormwater Runoff - Post -construction runoff into the storm drain shall not exceed pre - <br />construction runoff levels. The applicant's design professional shall evaluate the <br />project's impact to the City's storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines for Commercial <br />Development. [SDR] [ENGINEERING] <br />21. Exterior Lighting - Provide a lighting plan for proposed exterior lighting, including cut <br />sheets, a photometric site plan demonstrating light levels and a diagram showing light <br />spillover. This information shall be included in the building permit plans. New light <br />sources must not introduce glare or light effects that spill off the property. <br />[COA] [PLANNING] <br />22. Streetlights - New streetlights shall be installed at new intersections and as needed <br />along new streets to meet City standard lighting levels as prescribed in Engineering <br />Standards, Volume 3. Provide a lighting plan for proposed streetlighting, including cut <br />sheets, a photometric site plan demonstrating light levels and a diagram showing light <br />spillover. This information shall be included in the building permit plans. The style and <br />location of all streetlights shall be approved by the City Engineer. [SDR] [ENGINEERING] <br />23. Bicycle Parking - Provide for 20 short-term onsite bicycle parking spaces and <br />demonstrate this on the building permit plans in addition to bicycle parking within each <br />garage. [COA] [ENGINEERING] <br />24. Electric Vehicle Charging Stations - Provide for and install electric vehicle supply <br />equipment (EVSE) for each dwelling unit (131). Demonstrate this on the building permit <br />plans. [COA] [BUILDING] <br />25. Discards Collection - Prior to the issuance of a building permit, the applicant shall <br />submit to Engineering a Discards Collection Plan for review and approval. The plan shall <br />include the following elements and additional elements as required by City staff: <br />[COA] [ENGINEERING] <br />a. Maintenance and Service: Trash, recycling and composting (Discards) <br />storage areas shall include adequate space for the maintenance and servicing <br />of containers for all materials that are provided by local hauling companies. <br />b. Adequate Space for Trash, Recyclables and Compostables: The amount of <br />space provided for the collection and storage of recyclable materials shall be at <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 11 of 22 <br />