My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2018
>
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:07:18 AM
Creation date
4/30/2018 8:58:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
dedication shall extend from the property's southern property line shared with APN 052- <br />532-020 such line being approximately perpendicular to U.S. 101, extending <br />northwesterly to Redwood Creek. <br />29. Agreements -Prior to Final Map approval, enter into the following agreements in a form <br />acceptable to the City Attorney and the Community Development Director: <br />[CCA] [ENGINEERING] <br />a. A Landscape Maintenance Agreement for all assigned landscape areas in <br />public rights of way, easements, and/or on property in which the City holds an <br />interest to be maintained. Maintenance items shall include, but are not limited <br />to, planting trees, shrubs, flowers, grass and all appurtenances including <br />irrigation systems and pedestrian scale lighting. <br />b. A Stormwater Treatment Measures Maintenance Agreement for all on-site <br />stormwater treatment measures associated with the project. <br />c. An Improvement Agreement to guarantee the installation of all <br />improvements required of the project and to provide for payment of all City <br />inspection and plan check charges associated with the installation of public and <br />private improvements, including, but not limited to, streets, sanitary sewers, <br />water, storm drains and street lights. <br />d. An Off -Site Improvements Agreement for the installation of off-site <br />improvements where authorized by the project Development Agreement. The <br />agreement shall include provisions that the applicant is responsible for their <br />fair share of the costs associated with these improvements. The off-site <br />improvements associated with the agreement shall be completed prior to <br />building permit final. <br />e. CC&Rs including provisions for maintenance of and access to shared utilities, <br />stormwater treatment facilities, surface improvements, and common areas, <br />and an estimate of costs and proposed level of maintenance for each of the <br />activities identified. All property owners must be members. [COA] [PLANNING] <br />Reports and Survevs <br />30. Geotechnical Report - Include a geotechnical field review and reports for all grading <br />work, prepared by a licensed geotechnical engineer and in conformance with <br />Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall be <br />submitted as part of the building permit application. [SDR] [ENGINEERING] <br />31. As-Builts - Provide "as -built" or "record" drawings, to be submitted in paper, PDF and <br />AutoCAD formats prior to project sign -off. [COA] [ENGINEERING] <br />FEMA and Base Flood Elevations <br />32. Finished Floor Elevation (FFE) - The finished floor elevation (FFE) is shown to be <br />between 15.00 and 16.60 feet, based on NAVD88. FEMA has notified all the <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.