My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2018
>
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:07:18 AM
Creation date
4/30/2018 8:58:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/17/2018
Text box
ID:
1
Creator:
Created:
4/30/2018 8:59 AM
Modified:
4/30/2018 8:59 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.242UNUT
ID:
2
Creator:
Created:
4/30/2018 8:59 AM
Modified:
4/30/2018 8:59 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.242UNUT
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
36. Undergrounding Utilities - The applicant shall underground all overhead utilities <br />within the project site and along Maple Street, which shall be shown on the building <br />permit plans. [SDR] [ENGINEERING] <br />37. Sewer Capacity - Prior to encroachment permit issuance, submit to the City, and obtain <br />approval of, an evaluation and report prepared by a licensed engineer demonstrating that <br />the existing sewer mains have sufficient capacity for the project. The study shall consider <br />existing, project, other approved projects, and applications currently under review in <br />determining the needed capacity. If the existing sewer main is less than 6" in size, or is in <br />any other way not sufficient as determined by the City Engineer, applicant shall, as part <br />of the Project, construct and install new sewer mains sufficient to meet such <br />requirements, in accordance with the City's Engineering standards and as directed by the <br />City Engineer to the City Engineer's satisfaction. [SDR] [ENGINEERING] <br />38. Peak Wet Weather Flow Capacity - Redwood City has exceeded its Peak Wet Weather <br />Flow (PWWF) capacity in the past. A methodology to reduce inflow and infiltration (I/I) <br />by pipe replacement was determined. The applicant shall reduce (I/1) to offset increased <br />sewer demand from the project by replacing aged sewer mains or pay an equivalent in - <br />lieu fee. The length of pipe replacement required or the amount of fee will be based on <br />the project's sewage generation projection (Attachment L of the City's Engineering <br />Standards). For parcels within Redwood City but connecting to County owned and <br />maintained sewer, an 1/I in -lieu fee may be collected by Redwood City if the County does <br />not require main replacement or collect and in -lieu fee.. [COA] [ENGINEERING] <br />39. Sewer Lateral Limit -The project is limited to one sewer lateral connection to the City's <br />sewer main on Maple Street. The proposed sewer collection system installed along Maple <br />Street shall be installed as a private sewer main and shall have one point of connection <br />to the City's sewer main. [COA] [ENGINEERING] <br />40. Water Mains - Prior to encroachment permit issuance, submit to City, and obtain <br />approval of, an evaluation and report, prepared by a licensed engineer, in conformance <br />with the City's Engineering Standards, demonstrating that the proposed water main <br />meets the domestic and fire flow requirements in accordance with City Code Section <br />38.26 and the International Fire Code. If the existing water main is less than 6" in size, or <br />is in any other way not sufficient as determined by the City Engineer, applicant shall, as <br />part of the Project, construct and install new water mains sufficient to meet such <br />requirements, in accordance with the City's Engineering Standards and as directed by the <br />City Engineer. New water mains shall be 8" minimum in size and extend across the entire <br />property frontage, from the nearest point of connection to an existing 6" or larger water <br />main. [SDR] [ENGINEERING] <br />41. Water Transmission Main Installation - The project shall install a 24" HDPE water <br />transmission main from the northwesterly proposed end of Blomquist Street Extension, <br />connecting at the existing intersection of Blomquist Street and Maple Street, <br />approximately 1500 linear feet in total, in accordance with the project Development <br />Agreement. <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 15 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.