My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2018
>
Reso PC18-07 0027 PC Reso Approving Permits to 1548 Maple Street (Strada)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:07:18 AM
Creation date
4/30/2018 8:58:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/17/2018
Text box
ID:
1
Creator:
Created:
4/30/2018 8:59 AM
Modified:
4/30/2018 8:59 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
Created:
4/30/2018 8:59 AM
Modified:
4/30/2018 8:59 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
48. C3 Requirements -Plans shall be designed to meet C3 requirements of the Municipal <br />Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San <br />Mateo County C.3 Stormwater Technical Guidance. [SDR] [ENGINEERING] <br />a. Treatment Controls - Treatment measures to be shown on final improvement <br />or grading plans shall not differ materially from the treatment measures <br />presented on the project's Vesting Tentative Map, approved on without <br />written approval from the Engineering Department. <br />b. Treatment Measure Inspection - Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have <br />the City's designated inspector present at the time of installation, and shall have <br />the City's designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. <br />49. Stormwater Management Plan (SWMP) - Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact <br />Development (LID) treatment measures; total project site area and total area of land <br />disturbed; total new and/or replaced impervious area; treatment measures and <br />hydraulic sizing calculations; a listing of source control and site design measures to be <br />implemented at the site; saturated hydraulic conductivity rate(s) at relevant locations or <br />hydrologic soil type (A, B, C or D) and source of information; elevation of high seasonal <br />groundwater table; and a brief summary of how the project is complying with Provision <br />C.3 of the MRP. [COA] [ENGINEERING] <br />50. Construction General Permit - For construction activity resulting in a land <br />disturbance of one acre or more, applicant shall file a Notice of Intent (NOI) with the State <br />Water Resources Control Board under the Construction Activities Storm Water General <br />Permit (General Permit). The N0I indicates the applicant's intent to comply with the San <br />Mateo Countywide Stormwater Pollution Prevention Program, including a Stormwater <br />Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />51. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan <br />sheets are available electronically for inserting into project plans. [SDR] [ENGINEERING] <br />Street Infrastructure Improvements <br />52. Streetlights - Streetlights shall be installed as determined by the City Engineer. <br />Streetlights are required on Maple Street and Blomquist Street Extension. The style and <br />location of all streetlights shall be as determined by the City Engineer and Planning <br />Manager. [SDR] [ENGINEERING] <br />53. Repair or Replace Street Infrastructure - Restore streets surrounding the project site <br />to the satisfaction of the City Engineer at project completion. When this requires <br />additional pavement restoration, the Engineer shall approve the preferred layout of <br />pavement markings. [SDR] [ENGINEERING] <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.