73. Construction Meetings - The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA] [BUILDING] <br />a. Pre -Submittal - Prior to building permit submittal, schedule a <br />pre -submittal meeting with Building, Planning, Engineering and Fire staff to discuss <br />the permitting process and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to <br />start of construction, schedule a pre -construction meeting with Engineering, <br />Building, Fire, and Planning staff to discuss the inspection process and <br />requirements for construction and site work. The applicant shall arrange for the <br />attendance of the owner, developer, construction manager, contractor, and all <br />subcontractors who are responsible for grading and erosion and sedimentation <br />protection controls. <br />C. Interior Finishes & Amenities - After sheetrock inspection but <br />prior to installation, contact the Project Planner and Housing Staff to verify, to the <br />City's satisfaction, that all interior finishes and amenities in the affordable units are <br />equivalent to amenities used in market rate units. <br />74. Materials Mock -Up - Prior to final foundation inspection, prepare a mock-up that is <br />outdoors, readily accessible, and will remain intact until the project has reached <br />substantial completion. The mock-up should include all project colors and materials, <br />windows for the base and top, balconies, lighting, and architectural details, as well as <br />construction details, such as the weep screed, to understand how the design addresses <br />them. Then schedule a mock-up meeting with the Planning and Building Departments <br />for final review and approval of the project details. Submit an updated colors and <br />materials board or details if any changes are made as a result of the mock-up meeting. <br />[COA] [PLANNING] <br />75. Certification Letters - Prior to final inspection, submit certification letters from the <br />following architects verifying that the project, as constructed, complies with approved <br />plans. After the certification letter has been submitted, the project planner will also <br />confirm substantial compliance with the approved plans during the scheduled final <br />inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance <br />with the approved landscape plan, including species, size, quantity, and location of <br />the approved trees, shrubs, and groundcover. It shall also verify landscape lighting, <br />fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the <br />approved elevations, colors, materials, exterior light fixtures, and architectural <br />details. <br />76. Construction Management and Staging - Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for each <br />phase. Construction parking, material storage, equipment, or other construction -related <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 20 of 22 <br />