My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br /> <br /> <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR – 1548 MAPLE <br />REV: 04-30-18 PR <br />Page 28 of 49 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />Timeframe for <br />Implementation <br />Responsibility for <br />Implementation <br />Oversight of <br />Implementation <br />BIO-3 Continued BIO-3b: No pets or firearms shall be allowed at the project <br />site, with the exception of authorized law enforcement <br />personnel. <br />During all phases <br />of construction Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> BIO-3c: All food-related trash that may attract predators and <br />vermin shall be properly contained and removed from the <br />work site daily. <br />During all phases <br />of construction <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> BIO-3d: All refueling, maintenance, and staging of <br />equipment and vehicles shall occur at least 100 feet from <br />the top of bank of Redwood Creek. Secondary containment <br />shall be used during refueling. A spill prevention plan shall <br />be in place prior to the initiation of demolition or construction <br />activities. <br />During all phases <br />of construction Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> BIO-3e: All vehicles and equipment shall be maintained in <br />good working condition and free of leaks. <br />During all phases <br />of construction Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> BIO-3f: Standard Best Management Practices (BMPs) shall <br />be employed to avoid degradation of aquatic habitat by <br />maintaining water quality and controlling erosion and <br />sedimentation during construction as required by <br />compliance with the General National Pollution Discharge <br />Elimination System Permit for Construction Activities. <br /> <br />BMPs shall include, but not be limited to, installation of silt <br />fencing and erosion control wattles between Redwood <br />Creek and construction activities. <br />During all phases <br />of construction <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br /> BIO-3g: To prevent the entanglement of wildlife, no <br />erosion control devices containing plastic monofilament <br />netting shall be used or stored on site. <br />During all phases <br />of construction <br />Project Applicant Redwood City <br />Community <br />Development <br />Director 7.A. - Page 65
The URL can be used to link to this page
Your browser does not support the video tag.