My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 7 of 19 <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS <br />REV: 04-30-18 PR <br /> 7. Signage. A final detailed signage plan shall be submitted to Planning for approval prior to issuance of a building permit. The signage plan shall provide details of the interpretative sign displays, include a material sample, provide locations of all signs, shall comply with the City’s sign ordinance regulations and shall be consistent with the Plans approved by the City Council. [Planning] 8. Mitigation Measures. Provide written documentation of compliance with all required mitigation measures prior to issuance of a final Certificate of Occupancy. [COA][PLANNING] <br /> 9. Architectural Advisory Committee Review. The development requires final review by the Architectural Advisory Committee to address the rear buildings elevations of the buildings facing Redwood Creek prior to building permit issuance. Fees The following fees must be paid in full prior to issuance of the building permit unless otherwise described in the Development Agreement. 10. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the proposed project. [SDR] [ENGINEERING] 11. Parks Impact Fee – Pay a Parks Impact Fee for the new dwelling units resulting from the proposed project, prior to final map approval. [SDR][PARKS] 12. School Impact Fee – For residential additions greater than 500 square feet and new commercial or industrial construction, pay a School Impact Fee to the Sequoia Union High School District. Information regarding this fee may be obtained by contacting the Sequoia Union High School District at (650) 369-1411. [SDR][SCHOOL DISTRICT] 13. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater-related fees as outlined on the City’s website. [SDR][ENGINEERING] 14. Mitigation Fees – the project is subject to additional fees as outlined in the adopted <br />Mitigation Monitoring Plan. [COA][ENGINEERING] <br /> 15. Notice of Fees Protest – The applicant may protest any fees, dedications, reservations, or other exactions imposed by the City as part of the approval or as a condition of approval of this development. Per California Government Code Section 66020, this 90- day protest period has begun as of the date of the approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] Landscaping and Site Improvements 16. Water-Efficient Landscaping – Provide a landscaping and irrigation plan conforming to the California Water-Efficient Landscape Ordinance (AB 1881), including an automatic irrigation system (drip, micro-spray, or bubblers) with a rain sensor, and show these measures on the building permit plans. [COA][PLANNING] <br />7.A. - Page 192
The URL can be used to link to this page
Your browser does not support the video tag.