My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-07 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-07 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 9:26:27 AM
Creation date
5/3/2018 4:24:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 10 of 19 <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS <br />REV: 04-30-18 PR <br />[COA][ENGINEERING] 29. Right of Way – a 64-foot wide public right of way shall be dedicated to the City along the southwestern property line parallel to U.S. 101 for extension of Blomquist Street. The dedication shall extend from the property’s southern property line shared with APN 052- 532-020 such line being approximately perpendicular to U.S. 101, extending northwesterly to Redwood Creek. 30. Agreements - Prior to Final Map approval, enter into the following agreements in a form acceptable to the City Attorney and the Community Development Director: [COA][ENGINEERING] a. A Landscape Maintenance Agreement for all assigned landscape areas in public rights of way, easements, and/or on property in which the City holds an interest to be maintained. Maintenance items shall include, but are not limited to, planting trees, shrubs, flowers, grass and all appurtenances including irrigation systems and pedestrian scale lighting. b. A Stormwater Treatment Measures Maintenance Agreement for all on-site stormwater treatment measures associated with the project. c. An Improvement Agreement to guarantee the installation of all improvements required of the project and to provide for payment of all City inspection and plan check charges associated with the installation of public and private improvements, including, but not limited to, streets, sanitary sewers, water, storm drains and street lights. d. An Off-Site Improvements Agreement for the installation of off-site improvements where authorized by the project Development Agreement. The agreement shall include provisions that the applicant is responsible for their fair share of the costs associated with these improvements. The off-site improvements associated with the agreement shall be completed prior to building permit final. e. Draft CC&Rs including provisions for maintenance of and access to shared utilities, stormwater treatment facilities, surface improvements, and common areas, and an estimate of costs and proposed level of maintenance for each of the activities identified. All property owners must be members. [COA][PLANNING] Reports and Surveys 31. Geotechnical Report - Include a geotechnical field review and reports for all grading work, prepared by a licensed geotechnical engineer and in conformance with Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall be submitted as part of the building permit application. [SDR][ENGINEERING] 32. As-Builts – Provide “as-built” or “record” drawings, to be submitted in paper, PDF and AutoCAD formats prior to project sign-off. [COA][ENGINEERING] FEMA and Base Flood Elevations <br />7.A. - Page 195
The URL can be used to link to this page
Your browser does not support the video tag.