Laserfiche WebLink
Page 18 of 19 <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS <br />REV: 04-30-18 PR <br />uses are not allowed within the City right of way without prior approval from the City Engineer. [COA][ENGINEERING] 77. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control Handbook. Street closures require submission of traffic control plans and approval in advance. [SDR][ENGINEERING] 78. Winterizing - If construction is not complete by the start of the wet season (October 1 through April 30), implement a winterization program to minimize the potential for erosion and sedimentation. As appropriate to the site and status of construction, winterization requirements shall include inspecting/maintaining/cleaning all soil erosion and sedimentation controls prior to, during, and immediately after each storm event; stabilizing disturbed soils through temporary or permanent seeding, mulching, matting, tarping or other physical means; rocking unpaved vehicle access to limit dispersion of much onto public right-of-way; and covering/tarping stored construction materials, fuels, and other chemicals. Plans to include proposed measures to prevent erosion and polluted runoff from all site conditions shall be submitted for approval by CDD prior to beginning construction. As site conditions warrant, the City Engineer may direct the applicant to implement additional winterization requirements. [COA][ENGINEERING] 79. Grading – Grading shall be performed in accordance with the City’s Engineering Standards. Soil or other construction materials shall not be stockpiled in the public right- of-way. Submit cut/fill volumes (CY) for all soils to be imported to or exported from the site. [SDR][ENGINEERING] 80. Monitoring - The Soils Engineer shall conduct continuous site inspections during trenching and backfill operations at the applicant’s expense. The Soils Engineer shall take compaction tests and submit the results to Engineering & Construction. [SDR][ENGINEERING] Other Agency Permits 81. Caltrans - If a portion of the proposed work is within the State of California right-of-way (Woodside Road, El Camino Real, U.S. 101), the applicant shall contact the California Department of Transportation (Caltrans) at (510) 286-4417 to obtain all necessary Encroachment Permits. [SDR][ENGINEERING] 82. RWQCB, Army Corps, CAFW - Prior to the issuance of any building or engineering permits, applicant shall provide proof of RWQCB, Army Corps, and CAFW approval for the project. [SDR][ENGINEERING] General Requirements 83. Exterior Materials – The exterior materials, colors, textures, trim elements, windows and roof pitch of the project shall be consistent throughout and substantially conform to the colors and materials board, date received March 21, 2018, on file with Planning Services. [COA][PLANNING] <br />7.A. - Page 203