My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Sabro Communications, Inc. (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 Sabro Communications, Inc. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 3:31:58 PM
Creation date
5/4/2018 3:29:56 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Sabro Communications, Inc.
PROJECT NAME
CAT 6+ cabeling installation at Main Library
RMP File Number
304.5
Date
4/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />Scope of Work/ Tasks <br />1) Install 1 (one) CAT -6+ (550 MHz) PVC <br />rated cable from IDF Rooms to 9 (nine) <br />designated locations facing exits and <br />elevator doors to accommodate new POE <br />Cameras installation. <br />2) Install 2 (two) CAT -6+ (550 MHz) PVC <br />rated cable from IDF Room to 1 (one) <br />designated Additional location on the <br />2°a floor. <br />3) In the MPOE Room: Provide and Install <br />one 7'H x 19" W 2 -post Chatsworth <br />Standard Rack, two 45 -RU Vertical Cable <br />Managers, three 1 -RU Horizontal Cable <br />Managers and two 15" deep Shelves to <br />support new Cat -6 cabling. Rack shall <br />be braced back to the wall with 12" <br />Ladder Runway on top and anchored down <br />to the Concrete floor with appropriate <br />hardware. <br />Page 6 of 6 <br />REV: 03-29-18 JS <br />ATTY/AGR.2018.066/Sabro Communications Inc. <br />Deadline <br />6/30/2018 <br />6/30/2018 <br />6/30/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.