<br /> 05/07/2018 <br />Page 19 of 21  <br />ATTY/RESO.0033/CC RESO 1548 MAPLE APPROVING PROJECT PERMITS RESO. NO. 15662  <br />REV: 04‐30‐18 PR  MUFF NO. 601   <br />73. Construction Meetings – The applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA][BUILDING] <br /> <br />a. Pre‐Submittal – Prior to building permit submittal, schedule a pre‐submittal <br />meeting with Building, Planning, Engineering and Fire staff to discuss the <br />permitting process and submittal requirements. <br /> <br />b. Pre‐Construction ‐ After City permits are issued, but prior to start of <br />construction, schedule a pre‐construction meeting with Engineering, Building, <br />Fire, and Planning staff to discuss the inspection process and requirements <br />for construction and site work. The applicant shall arrange for the attendance <br />of the owner, developer, construction manager, contractor, and all <br />subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. <br />c. Interior Finishes & Amenities ‐ After sheetrock inspection but prior to <br />installation, contact the Project Planner and Housing Staff to verify, to the <br />City’s satisfaction, that all interior finishes and amenities in the affordable units <br />are equivalent to amenities used in market rate units. <br />74. Materials Mock‐Up – Prior to final foundation inspection, prepare a mock‐up that is <br />outdoors, readily accessible, and will remain intact until the project has reached <br />substantial completion. The mock‐up should include all project colors and materials, <br />windows for the base and top, balconies, lighting, and architectural details, as well as <br />construction details, such as the weep screed, to understand how the design addresses <br />them. Then schedule a mock‐up meeting with the Planning and Building Departments <br />for final review and approval of the project details. Submit an updated colors and <br />materials board or details if any changes are made as a result of the mock‐up meeting. <br />[COA][PLANNING] <br /> <br />75. Certification Letters ‐ Prior to final inspection, submit certification letters from the <br />following architects verifying that the project, as constructed, complies with approved <br />plans. After the certification letter has been submitted, the project planner will also <br />confirm substantial compliance with the approved plans during the scheduled final <br />inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location of the <br />approved trees, shrubs, and groundcover. It shall also verify landscape lighting, <br />fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved <br />elevations, colors, materials, exterior light fixtures, and architectural details. <br /> <br />76. Construction Management and Staging ‐ Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for each <br />phase. Construction parking, material storage, equipment, or other construction‐related