Laserfiche WebLink
N <br />25 <br />VIII. PUMP STATION - LAGOON <br />0 <br />ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT <br />AREA "E" <br />1. <br />Lump <br />Sum <br />Strip site, dispose of debris <br />Lump Sum <br />5 2,625.00 <br />2. <br />75 <br />LF <br />54" Intake piping275.00 <br />20,625.00 <br />3. <br />Lump <br />Sum <br />Lagoon intake structure <br />12,300.00 <br />22,300.00 <br />4. <br />Lump <br />Sum <br />Pump station and pumps <br />Lump Sum <br />145,000.00 <br />5. <br />300 <br />IF <br />49" CMP outlet piping <br />500.00 <br />100,000.00 <br />6. <br />Lump <br />Sum <br />Automatic controls <br />Lump Sum <br />421,000.00 <br />$311,550.00 <br />188 Engineering <br />56,079.00 <br />TOTAL CONSTRUCTION COST $367,629.00 <br />^ f <br />