Laserfiche WebLink
4 <br />34 <br />PROJECT ESTIMATE <br />FOR <br />q <br />IMPROVEMENTS SCHEDULED TO BE COMPLETED IN 1988 <br />AREA F. UNIT 2 <br />MARINE WORLD PARKWAY <br />1. ROADWAY <br />a. Right <br />of Wn_. <br />Item <br />quantl•Y <br />Unit <br />DescriDtion <br />Unit Price <br />Amount <br />AREA F <br />UNIT 1 <br />i <br />_ <br />1. <br />Lump Sum <br />IS <br />Strip site <br />Lump Sum <br />14,712.50 <br />2. <br />142,900 <br />SF <br />Excavation and embankment <br />$0.34 <br />46,536.00 <br />3. <br />2,520 <br />IF <br />Type A curb a^d gutter <br />9.30 <br />24,696.00 <br />4. <br />2,720 <br />LF <br />Type B curb and gutter <br />8.75 <br />23,800.00 <br />5. <br />48,300 <br />SF <br />4" AC <br />0.95 <br />45,885.00 <br />6, <br />48,300 <br />SF <br />8" Class 2 AS <br />0.55 <br />26,565.00 <br />7. <br />48,300 <br />SF <br />10" Class 2 ASB <br />0.60 <br />28,980.00 <br />8. <br />10,560 <br />SF <br />8' Wide bike path <br />1.50 <br />15,840.00 <br />a <br />9. <br />4,840 <br />SF <br />4' Wide concrete sidewalk <br />1.95 <br />9,438.00 <br />10. <br />2 <br />EA <br />Handicap ramp <br />185.00 <br />370.00 <br />�1 <br />11. <br />2 <br />EA <br />Survey monument <br />135.00 <br />270.00 <br />12. <br />35 <br />LF <br />42" SO <br />.40.00 <br />4,900.00 <br />13. <br />70 <br />LF <br />27" SD <br />81.00 <br />5,670.00 <br />14. <br />370 <br />LF <br />24" SO <br />77.00 <br />28,490.00 <br />15. <br />250 <br />LF <br />21" SD <br />63.00 <br />15,750.00 <br />16. <br />248 <br />IF <br />18" SO <br />46.00 <br />11,408.00 <br />17. <br />5 <br />EA <br />Type I catch basin <br />11850.00 <br />9,250.00 <br />18. <br />3 <br />EA <br />Type II catch basin <br />2,100.00 <br />6,300.00 <br />19. <br />1 <br />EA <br />Type II SOS:N <br />2,100.00 <br />2,100.On <br />L <br />20. <br />9 <br />EA <br />Storm drain plug <br />150.00 <br />1,350.00 <br />L <br />21. <br />1,260 <br />LF <br />Utility duct bank <br />55.00 <br />69,300.01 <br />22. <br />1,160 <br />LF <br />Median landscaping <br />40.00 <br />46,400.00 <br />23. <br />6 <br />EA <br />Double arm electrolier <br />3,100.00 <br />18,600.00 <br />24. <br />1,260 <br />IF <br />Lighting, conduit and wire <br />7.00 <br />8,820.30 <br />25. <br />LOT <br />LS <br />Signing, striping, marking <br />Lump Sum <br />10,080.00 <br />26. <br />1 <br />EA <br />Lagoon entrance 6 dewater <br />34,300.00 <br />34,000.00 <br />27. <br />1 <br />EA <br />Lagoon entrance d dewater <br />29,000.00 <br />29,000.00 <br />w <br />TOT. -.L ESTIMATED CONSTRUCTION <br />COST <br />540,560.50 <br />182 ENGINEERING <br />97,301.00 <br />TOTAL CONSTRUCTION COST <br />$637.862.00 <br />q <br />