4
<br />34
<br />PROJECT ESTIMATE
<br />FOR
<br />q
<br />IMPROVEMENTS SCHEDULED TO BE COMPLETED IN 1988
<br />AREA F. UNIT 2
<br />MARINE WORLD PARKWAY
<br />1. ROADWAY
<br />a. Right
<br />of Wn_.
<br />Item
<br />quantl•Y
<br />Unit
<br />DescriDtion
<br />Unit Price
<br />Amount
<br />AREA F
<br />UNIT 1
<br />i
<br />_
<br />1.
<br />Lump Sum
<br />IS
<br />Strip site
<br />Lump Sum
<br />14,712.50
<br />2.
<br />142,900
<br />SF
<br />Excavation and embankment
<br />$0.34
<br />46,536.00
<br />3.
<br />2,520
<br />IF
<br />Type A curb a^d gutter
<br />9.30
<br />24,696.00
<br />4.
<br />2,720
<br />LF
<br />Type B curb and gutter
<br />8.75
<br />23,800.00
<br />5.
<br />48,300
<br />SF
<br />4" AC
<br />0.95
<br />45,885.00
<br />6,
<br />48,300
<br />SF
<br />8" Class 2 AS
<br />0.55
<br />26,565.00
<br />7.
<br />48,300
<br />SF
<br />10" Class 2 ASB
<br />0.60
<br />28,980.00
<br />8.
<br />10,560
<br />SF
<br />8' Wide bike path
<br />1.50
<br />15,840.00
<br />a
<br />9.
<br />4,840
<br />SF
<br />4' Wide concrete sidewalk
<br />1.95
<br />9,438.00
<br />10.
<br />2
<br />EA
<br />Handicap ramp
<br />185.00
<br />370.00
<br />�1
<br />11.
<br />2
<br />EA
<br />Survey monument
<br />135.00
<br />270.00
<br />12.
<br />35
<br />LF
<br />42" SO
<br />.40.00
<br />4,900.00
<br />13.
<br />70
<br />LF
<br />27" SD
<br />81.00
<br />5,670.00
<br />14.
<br />370
<br />LF
<br />24" SO
<br />77.00
<br />28,490.00
<br />15.
<br />250
<br />LF
<br />21" SD
<br />63.00
<br />15,750.00
<br />16.
<br />248
<br />IF
<br />18" SO
<br />46.00
<br />11,408.00
<br />17.
<br />5
<br />EA
<br />Type I catch basin
<br />11850.00
<br />9,250.00
<br />18.
<br />3
<br />EA
<br />Type II catch basin
<br />2,100.00
<br />6,300.00
<br />19.
<br />1
<br />EA
<br />Type II SOS:N
<br />2,100.00
<br />2,100.On
<br />L
<br />20.
<br />9
<br />EA
<br />Storm drain plug
<br />150.00
<br />1,350.00
<br />L
<br />21.
<br />1,260
<br />LF
<br />Utility duct bank
<br />55.00
<br />69,300.01
<br />22.
<br />1,160
<br />LF
<br />Median landscaping
<br />40.00
<br />46,400.00
<br />23.
<br />6
<br />EA
<br />Double arm electrolier
<br />3,100.00
<br />18,600.00
<br />24.
<br />1,260
<br />IF
<br />Lighting, conduit and wire
<br />7.00
<br />8,820.30
<br />25.
<br />LOT
<br />LS
<br />Signing, striping, marking
<br />Lump Sum
<br />10,080.00
<br />26.
<br />1
<br />EA
<br />Lagoon entrance 6 dewater
<br />34,300.00
<br />34,000.00
<br />27.
<br />1
<br />EA
<br />Lagoon entrance d dewater
<br />29,000.00
<br />29,000.00
<br />w
<br />TOT. -.L ESTIMATED CONSTRUCTION
<br />COST
<br />540,560.50
<br />182 ENGINEERING
<br />97,301.00
<br />TOTAL CONSTRUCTION COST
<br />$637.862.00