My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt82 DDA Redwood Shores Inc. GID 1-64
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1982
>
Agmt82 DDA Redwood Shores Inc. GID 1-64
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:14:09 PM
Creation date
5/14/2018 12:08:16 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood Shores Inc.
PROJECT NAME
GID 64
RMP File Number
304
Date
6/16/1982
MO Ref
SEE ORD 1859
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOTAL <br />1121AIR VALVE <br />INCLUDINGSCATHODIC 10.0012 A 1 382.00 S 0.46 I $ 134.4 1 <br />I I HATER 1 1 1 $ 134 34 <br />187. ENGINEERING <br />TOTAL WORK/COST PER LIN FOOT <br />1 <br />i1 <br />11II 14ATER TANK <br />1 TOTAL WATER TANK COST <br />2 <br />e BASED ON TWIN DnLPHIN DRIVE BID (6-18-79) <br />i I S 24.13 <br />S 158.52 <br />I I I 1 <br />I <br />.I <br />EA2,500,000 5,000,000151000,000 1 <br />1 15,000,000 1 <br />f <br />56 <br />UNIT <br />COST <br />-z <br />DESCRIPTIONI <br />QUANTITY <br />COST <br />PER <br />IMTT <br />_II WATER <br />16" L d C.S.P. (INCLUDING .JOINTS, <br />[-F.' <br />1 <br />FITTINGS, THRUST BLOCK 4 CATH.PROT. <br />1 <br />S120.00 <br />$120.00 1 <br />12 I <br />" BUTTRFLY VALVES(INCLUDING <br />10.0004 <br />IEA. <br />'3,060.00 <br />1 <br />CATHODICEP OTECTTONI <br />S 122 <br />3 1 <br />S" GATE (INCLUDING CATHODIC1O <br />PROTECTION)VES <br />0015 <br />IFA. <br />Ik 816.00 <br />$ 1.22 <br />14 1 <br />8" A.C.P. 2,000 IF <br />1 0.20 <br />1L. F.IM <br />24.48 <br />$ 4.90 1 <br />5 I <br />FIRE HYDRANT ASSY. INCLUDING <br />CATHODIC <br />10.0008 <br />IRA <br />12,550.001 <br />S 7.05 1 <br />16 I <br />TEE 16" <br />xCATHODIC <br />INCLUDING <br />1 0.001 <br />714,001 <br />$ 0.71 1 <br />17 I <br />�EA. <br />INCLUDING CATHODIC PROTECTION <br />10.0015 <br />EA <br />1!1,224.001 <br />1 <br />$ 1.844" <br />IBI <br />GATE VALVE <br />INCLUDDING CATHODIC <br />10.0015 <br />IEA I <br />617.001 <br />$ 0.92 I <br />19 1 <br />TEE 16" x 16" x 4" <br />INCLUDING CATHODIC <br />0.0005 <br />1EA <br />510.001 <br />$ 0.26 1 <br />1101 <br />TEE 16" x 16" x 8" <br />10.0005 <br />714.00 <br />$ 0.36 1 <br />1111 <br />TEST 4 STERILIZATION <br />10.0004 <br />11F.A <br />1EA <br />1,020,001 <br />S 0.41 1 <br />TOTAL <br />1121AIR VALVE <br />INCLUDINGSCATHODIC 10.0012 A 1 382.00 S 0.46 I $ 134.4 1 <br />I I HATER 1 1 1 $ 134 34 <br />187. ENGINEERING <br />TOTAL WORK/COST PER LIN FOOT <br />1 <br />i1 <br />11II 14ATER TANK <br />1 TOTAL WATER TANK COST <br />2 <br />e BASED ON TWIN DnLPHIN DRIVE BID (6-18-79) <br />i I S 24.13 <br />S 158.52 <br />I I I 1 <br />I <br />.I <br />EA2,500,000 5,000,000151000,000 1 <br />1 15,000,000 1 <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.