Laserfiche WebLink
51 <br />� DESCRIPTION <br />f <br />1 I STREET <br />+187, PNOINEERING <br />TOTAL STREET COST PER LIN. FOOT <br />II I <br />III WATER LINE <br />+18% ENGINEERING <br />TOTAL. WATER COST I <br />II <br />WATER TANK 4 ACCESSORIES <br />II W/3.5 HELLION CAL. CAPACITY <br />+18Z ENGINEERING <br />WATER TANK S ACCESSORIES TOTAL COSTI <br />I4 SANITARY SEWER I <br />II <br />QUANTITY <br />1 <br />UNIT COST PER <br />COST I UNIT TOTAL <br />I <br />ttp <br />fry <br />'93.93 l� <br />1$ 346.83 " <br />I I i <br />I I <br />LF I IS 134.34 134. 34' <br />24.18 1 <br />I IL^, 138.52 1 <br />I III <br />1 I I II_ <br />P�. 500,004 $2,500,004 $2 500 DDG - <br />1$ •450,000 <br />1$2,950,000 <br />I I L <br />3 <br />