My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:10:38 PM
Creation date
5/17/2018 5:10:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OAK #4843-3885-9090 v10 16 <br />ATTY/AGR/2018.094/STRADA DOCKTOWN DEVELOPMENT AGREEMENT <br />REV: 05-03-18 PR <br />Page 16 of 93 <br />Section 3.3 Blomquist and Maple Street Extension/Reconfiguration and Land <br />Exchange. Subject to City Council’s approval of the proposed Maple Street vacation action and <br />the terms of Section 3.3C below, and subject to the credits described in Section 6.2 below, <br />Developer, at its expense, shall (i) reconfigure and reconstruct Maple Street to conform to the new <br />street layout envisioned by the proposed Maple Street vacation action as generally depicted on <br />Exhibit C and more particularly provided in the plans and specifications dated March 21, 2018, <br />included with Developer’s PD Submittal-05 application; and (ii) construct the three separate <br />segments of the Blomquist Street Extension, comprised of the Blomquist – Developer Segment, <br />the Blomquist – County Segment and the Blomquist – City Segment, all as generally shown on <br />Exhibit C, and more particularly provided in Developer’s Tentative Map submittal dated March <br />22, 2018. <br />A. Blomquist and Maple Street Land Swap Agreement. To facilitate the <br />reconfiguration and reconstruction of Maple Street and the Blomquist Street Extension, Developer <br />and City, promptly following completion of the Maple Street Vacation, shall enter into a <br />“Agreement for Exchange of Real Property” substantially in the form of Exhibit F providing, <br />among other things, for the exchange of City’s fee interest in the Maple Street Vacation Area for <br />a public right-of-way and public services easement over the Blomquist – Developer Segment. <br />Except as otherwise agreed by City Manager or his or her designee in his or her sole discretion, <br />the closing for exchange of City’s fee interest in the Maple Street Vacation Area for a public right- <br />of-way and public services easement over the Blomquist – Developer Segment shall occur <br />concurrently with recordation of the Final Map for the Project. Developer may request entry to <br />the Maple Street Vacation Area prior to the exchange closing in order to conduct site preparation <br />and grading activities. Any such entry shall be undertaken pursuant to a right of entry agreement <br />or encroachment permit in form reasonably acceptable to the City Attorney. City approval of the <br />request for pre-closing right of entry shall not be unreasonably withheld. <br />B. Blomquist – City Segment. Subject to the credits described in Section 6.2 <br />below, Developer, at its expense, shall construct or cause the construction of that portion of the <br />Blomquist Street Extension located on the unimproved, existing City-owned Blomquist Street <br />right-of-way (“Blomquist – City Segment”), as generally depicted on Exhibit C. To ensure that <br />the construction of the Blomquist – City Segment is coordinated and appropriately phased with <br />the Project, Developer shall commence construction of the Blomquist – City Segment no later than <br />six (6) months after the date of the issuance of the building permit for the first residential unit, or <br />such later date as mutually agreed to by the Parties in writing. Developer shall substantially <br />complete the Blomquist – City Segment within thirty (30) months after commencement of <br />construction and in any event prior to the issuance of the first certificate of occupancy for any <br />residential unit within the Project. For the avoidance of doubt, Developer’s obligation to construct <br />or cause the construction of the Blomquist – City Segment is not contingent upon City’s ability to <br />obtain from County a license or right of entry with respect to the County-owned parcel by the <br />County Segment Outside Date as provided in Section 3.3C below. <br />C. Blomquist –Developer and County Segments. Subject to the terms of this <br />Section 3.3C, Developer, at its expense, shall construct or cause the construction of the Blomquist <br />– Developer Segment and the portions of the Blomquist Street Extension located on the County- <br />owned parcel designated as APN 050-532-020 and APN 052-532-030 and on the adjacent <br />6.4.B. - Page 41
The URL can be used to link to this page
Your browser does not support the video tag.