My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:10:38 PM
Creation date
5/17/2018 5:10:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br />353 Main Street Apartments <br />Redwood City, California <br />May L,20L8 <br />(Originol Report Dated November 18,2076) <br />of gravel layers orgeotextiles mayalso be necessaryto help stabilize unstable soils. The <br />geotechnical engineer should be contacted for recommendations for mitigating unstable <br />soils. <br />At a minimum, the following should be provided by the geotechnical engineer: <br />. Review of final grading and foundation plans, <br />. Professional observation during site preparation, grading, and foundation <br />excavation, <br />. Oversight of soil compaction testing during grading, <br />. Oversight of soil special inspection during grading. <br />Special inspection of grading should be provided as per Section L704.7 and Table 1704.7 <br />of the CBC; the soils special inspector should be under the direction of the geotechnical <br />engineer. ln our opinion, the following operations should be subject to continuous soils <br />special inspection: <br />o Scarification and recompaction, <br />o Fill placement and compaction, <br />o Ground lmprovement (DDP) <br />ln our opinion, the following operations may be subject to periodic soils special <br />inspection; subject to approval by the Building Official: <br />o Site preparation, <br />o Overexcavation to the recommended depth, <br />o Compaction of utility trench backfill, <br />o Compaction of subgrade and aggregate base, <br />o Observation of foundation excavations, <br />o Building pad moisture conditioning. <br />It will be necessary to develop a program of quality control prior to beginning grading. lt <br />is the responsibility of the owner, contractor, or project manager to determine any <br />additional inspection items required by the architect/engineer or the governing <br />jurisdiction. <br />The locations and frequencies of compaction tests should be as per the recommendations <br />of the geotechnical engineer at the time of construction. The recommended test <br />locations and frequencies may be subject to modification by the geotechnical engineer <br />based upon soil and moisture conditions encountered, the size and type of equipment <br />6 <br />7 <br />9 <br />8. <br />301842-001 22 1610-038.SER.REV2 <br />7.B. - Page 80
The URL can be used to link to this page
Your browser does not support the video tag.