My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-05-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-05-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 3:10:38 PM
Creation date
5/17/2018 5:10:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM <br />Review of Geotechnical Study <br />Proposed Main Street Apartments <br />353 Main Street, Redwood City, California <br />May 18, 2018 <br />Project No. 1-1089 <br />Page 7 of 7 <br />This memorandum was prepared for advanced discussion and planning, and as well as to provide <br />a set of preliminary risk concerns that could require additional study and reconciliation. We <br />reserve the right to modify our findings and conclusions as new information becomes available. <br />Our findings and conclusions are not intended to negate any standing jurisdictional or code <br />requirements. Rather, this memorandum is intended to supplement the foregoing and provide BNI <br />with guidance regarding the CEQA issues raised by the Project and how it might comply with the <br />requirements of the applicable jurisdictional agencies. <br />350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3SoilWorks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.