My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 NBC Construction & Engineering, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Under 60 K
>
Agmt18 NBC Construction & Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 8:30:55 AM
Creation date
5/23/2018 8:30:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
NBC Construction & Engineering, Inc.
PROJECT NAME
Fence trash enclosure
RMP File Number
304.5
Date
3/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />1. Scone of Work/ Tasks Deadline <br />Install the Fence Trash Enclosure in the location identified <br />in Exhibit B. Enclosure must have a 75% view block <br />except across the top and have a drain per the plan that is <br />provided in Exhibit B. Such work includes performing the <br />following tasks: <br />• Cut the Asphalt 12"x16' or 6"x18"x 16' <br />• Remove the soil and asphalt <br />• Place 3/4" drain rock per Exhibit B <br />• Install 8' chain link Fence with all the <br />required posts and bracing not to <br />exceed 8' with cone bolt <br />• Install 16' double gate chain link Fence <br />• Install total of 7 concrete car/trash bin stop <br />• Clean and off haul the debris <br />Exclusions: <br />• Permit ( NOT REQUIRED) <br />• Survey (NOT REQUIRED) <br />2. Pavment Terms. <br />All of the work is to be completed in a substantial and <br />workman like manner that meets the State of California <br />requirements for the sum of Fourteen Thousand Three <br />Hundred and Twenty Dollars ($ 14,320.00). Payment to <br />be made each 10 days as the work progresses to the value <br />of one hundred percent (100 %) of all work completed. <br />The entire amount of the contract is to be paid within 30 <br />days after completion. <br />Any alterations or deviation from the above specifications <br />involving extra cost of material or labor will be executed <br />upon written order and will become an extra charge over <br />the sum mentioned in this contract. All agreements must <br />be made in writing. <br />Page 6 of 10 <br />REV: 05-09-18 RL <br />ATN/AGR/2018.063/NBC CONSTRUCTION FENCE TRASH ENCLOSURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.