My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Moffatt & Nichol Engineer
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Moffatt & Nichol Engineer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 4:22:17 PM
Creation date
1/3/2006 10:26:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Moffatt & Nichol Engineers
PROJECT NAME
engineering & design services
RMP File Number
304
Date
12/28/2005
MO Ref
05-222, 08-220, 13-132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~~1ItI <br /> <br />MOFFATT & NICHOL <br /> <br />EXHIBIT -A::- <br /> <br />2001 N. Main Street <br />Suite 360 <br />Walnut Creek, California 94596 <br /> <br />(925) 944-5411 <br />Fax (925) 944-4732 <br /> <br />July 13, 2009 <br /> <br />-transmitted via e-mail- <br /> <br />Mr. Brian Lee <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94064 <br /> <br />Subj: Additional Testing and Regulatory Approvals <br />Redwood Shores Lagoon Maintenance Dredging Project <br />M&N File No: 5864 <br /> <br />Dear Brian: <br /> <br />This proposal provides a scope of work and fee for providing the :additioFlol GQFflpling ORG <br />..toGtiAg OUJ3port for tAo dfOelgO ooEJimoRts-i-A Zone 9, alOl~g v:ith the required regulatory <br />approvals and contract document revisions for the Redwood Shores Lagoon Maintenance <br />Dredging Project. This proposal is pursuant to the additional testing required by the Regional <br />Water Quality Control Board (RWQCB), as part of the Dredge Material Management Office <br />(DMMO) due to the high PAH results identified in the previous test results. <br /> <br />The sediment chemistry results are being fast-tracked with the intent of meeting the next <br />DMMO meeting on July 22. A breakdown of the scope of work is below. <br /> <br />Scope of Work <br /> <br />We propose the following scope of work based on our discussions. <br /> <br />1. Samplina & Testina Support (June 8 - June 27) <br /> <br />M&N worked with Kinnetic Laboratories Inc. and Huffman-Broadway Group to expedite test <br />results to the RWQCB, from the sampling that took place on June 8, and reach consensus <br />on the sediment test results. Based on the discussions with RWQCB and a subsequent <br />email dated June 12, additional higher resolution testing was required in Zone 9 to further <br />characterize the extent of the high PAH readings from the previous samples. Additional <br />sampling points were proposed by the project team and a figure was sent to the RWQCB <br />identifying the extent of the additional sediment cores. The plan was accepted by the <br />RWQCB and Kinnetic began testing on June 26. The effort to date, by M&N is sixteen (16) <br />hours. A figure of the approved sediment testing locations is attached. <br /> <br />2. Permittina Support - DMMO Meetinas & Permit Support <br /> <br />This effort includes the review of sediment test results prior to the DMMO meeting and <br />attendance at the DMMO meeting to discuss the sediment test results and determine the <br />possible extent of dredging in Zone 9. <br /> <br />3. Revisions to Contract Plans <br /> <br />This task includes amending the current set of contract plans to include all revisions to <br />dredge areas and disposal locations from the most recent sediment testing results. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.