My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15665
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 8:11:51 AM
Creation date
5/24/2018 8:11:09 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/21/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
httD://Dermits.redwoodcitv.oro [COA][PLANNING] <br />76. Construction Meetings — The applicant is required to contact the Permit <br />Counter (650.780.7350) to schedule the following meetings prior to or during <br />construction. [COA][BUILDING] <br />a. Pre -Submittal — Prior to building permit submittal, schedule a pre -submittal <br />meeting with Building, Planning, Engineering and Fire staff to discuss the <br />permitting process and submittal requirements. <br />b. Pre -Construction - After City permits are issued, but prior to start of <br />construction, schedule a pre -construction meeting with Engineering, <br />Building, Fire, and Planning staff to discuss the inspection process and <br />requirements for construction and site work. The applicant shall arrange for <br />the attendance of the owner, developer, construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and <br />sedimentation protection controls. <br />C. Interior Finishes & Amenities - After sheetrock inspection but prior to <br />installation, contact the Project Planner and Housing Staff to verify, to the <br />City's satisfaction, that all interior finishes and amenities in the affordable <br />units are equivalent to amenities used in market rate units. <br />77. Materials Mock -Up — Prior to final foundation inspection, prepare a mock-up that <br />is outdoors, readily accessible, and will remain intact until the project has <br />reached substantial completion. The mock-up should include all project colors <br />and materials, windows for the base and top, balconies, lighting, and architectural <br />details, as well as construction details, such as the weep screed, to understand <br />how the design addresses them. Then schedule a mock-up meeting with the <br />Planning and Building Departments for final review and approval of the project <br />details. Submit an updated colors and materials board or details if any changes <br />are made as a result of the mock- up meeting. [COA][PLANNING] <br />78. Certification Letters - Prior to final inspection, submit certification letters from <br />the following architects verifying that the project, as constructed, complies with <br />approved plans. After the certification letter has been submitted, the project <br />planner will also confirm substantial compliance with the approved plans during <br />the scheduled final inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location of <br />the approved trees, shrubs, and groundcover. It shall also verify landscape <br />lighting, fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved <br />elevations, colors, materials, exterior light fixtures, and architectural details. <br />79. Construction Management and Staging - Prior to encroachment permit <br />ATTY/RESO.0041/CC RESO DENYING THE APPEAL FOR 353 MAIN STREET RESO NO. 15665 <br />REV: 05-14-18 PR MUFF NO. 603 <br />Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.