My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 On Broadway Redwood City
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 On Broadway Redwood City
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2008 10:37:50 AM
Creation date
1/3/2006 11:47:43 AM
Metadata
Fields
Template:
Agreement
Contractor Name
On Broadway Redwood City
PROJECT NAME
construction & reimbursement
RMP File Number
405 bin 24
Date
10/26/2005
MO Ref
05-197 RD-05-13
Box
6571
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lights, ornamental street furniture, and other streetscape features that will enhance the <br />dining and entertainment experience downtown being created by the retail-cinema <br />project "On Broadway." A drop-off area for movie- goers will be constructed on <br />Broadway next to the theatre that will be flanked with palm trees and street trees. <br />D. The City and Agency have further determined that the following street <br />improvements are required in connection with the Project: (1) The section of Jefferson <br />Avenue from Marshall Street to Middlefield Road needs to be revised from four lanes, <br />two lanes in each direction; to two lanes, one in each direction with a center left turn <br />lane, along with diagonal parking on the east side. This work will also include replacing <br />the existing traffic signals at the intersection of Jefferson Avenue and Broadway and <br />modifying the signals at Middlefield and Jefferson Avenue. This work is contiguous with <br />the construction of the "On Broadway" project. (2) A large portion of the roadway on <br />Middlefield Road between Winslow and Broadway will be constructed on top of the <br />City's underground parking facility; and new utility services for water, sewer, gas, <br />electric and rain water leaders will need to be installed and connected in the public right- <br />of-way surrounding the Project. This work is referred to collectively as the "Street <br />Modifications." Coordinating construction of the Streetscape Improvements, the Street <br />Modifications and the underground parking garage will minimize any further disruption <br />to the downtown businesses and support the timely opening of the "On Broadway" <br /> <br />development. <br />E. As specified in the DDA, Developer will construct the Streetscape <br />Improvements and Street Modifications, and is responsible for overseeing the <br />development and construction of the Streetscape Improvement portion of the Project, <br />pursuant to the terms and conditions contained in this Agreement. <br />F. The City, the Agency and Developer have previously entered into that <br />certain Construction and Reimbursement Agreement for Relocation of Reinforced <br />Concrete Box Culvert, dated April 8, 2003 (the "Culvert Relocation Agreement") <br />providing for the Developer's oversight of the design, development and construction of <br />the relocation of the Reinforced Concrete Box Culvert on the Project Site and the <br />relocation of private utility lines thereon. <br /> <br />Atty/Agr/2005.072 <br />101105 <br />840847v12 33786/0001 LBack <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.