<br />b¡--ö <br /> <br />REDWOOD CITY - WATER FINANCING PLAN <br /> <br />Background <br /> <br />Redwood City currently faces substantial water reliability and supply deficiencies. The <br />City relies on a single source of potable water supply: the San Francisco Public Utility <br />Commission's (SFPUC) Retch Retchy regional water system. The City's water demands <br />have exceeded its annual SFPUC contractual supply assurance of 12,243 acre-feet (AF) <br />by an average of about 800 AF over the past five years, with the annual overdraft peaking <br />at over 1,400 AF in 2003/04. Based on current consumption levels, a 20% SFPUC <br />systemwide drought would result in roughly a 30% reduction in the City's supply <br />assurance. <br /> <br />Without a reliable, supplemental source of supply, the City will: <br />a. remain at high risk for not meeting its existing customers' water needs during <br />periods of drought, <br />b. remain vulnerable to future SFPUC rate surcharges on water use that exceeds the <br />City's supply assurance when SFPUC system demand reaches full capacity. <br />c. not be able to provide water supply to meet future demands of growth, and <br />d. remain vulnerable to severe financial impacts during periods of drought <br /> <br />In August 2002, Kennedy/Jenks Consultants submitted the "Water Recycling Feasibility <br />Study for Redwood City". The study evaluated options for reducing the City's reliance <br />on SFPUC water and concluded that the only viable, and most cost-effective way to meet <br />the City's water reliability and supply deficiencies is via construction of a recycled water <br />system coupled with an effective water conservation program. Kennedy/Jenks also <br />developed a preliminary recommendation for a recycled water system based on analysis <br />of a number of project alternatives. <br /> <br />In late 2003, the City Council appointed a 20-member Community Task Force on <br />Recycled Water (the "Task Force") to evaluate recycled water project options and <br />recommend potential solutions to resolve the City's water supply deficit. In the spring of <br />2004, after five months of meetings and evaluation, the Task Force unanimously <br />recommended implementation of a revised recycled water project coupled with an <br />aggressive conservation program. Soon thereafter, the City began implementing the Task <br />Force recommendations <br /> <br />Purpose & Scope <br /> <br />Bartle Wells Associates was initially retained as a subcontractor to Kennedy/Jenks to <br />develop a financing plan to fund the recycled water project. In December 2002, Bartle <br />Wells Associates submitted the "Redwood City Water Financing Plan" detailing findings <br />and recommendations. The financing plan was most recently updated in December 2004, <br />prior to the City's February 2005 issuance of water revenue bonds to fund the first year of <br />project costs. <br /> <br />1 <br />