My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Power Engineering... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Power Engineering... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2006 10:51:17 AM
Creation date
1/9/2006 10:47:43 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Power Engineering Contractors
PROJECT NAME
Fifth Ave pump station - emergency work
RMP File Number
802
Date
9/23/2005
MO Ref
05-202
Sticky Note
ID:
1
Text:
1 agreement
10 payment bond
16 faithful perf bond
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California (hereinafter referred to as "City") and POWER ENGINEERING <br />CONTRACTORS, of Alameda, California (hereinafter referred to as "Contractor") <br />(collectively, the "Parties"), for the consideration hereinafter stated, hereby agree as <br />follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform, within <br />approximately sixty (60) calendar days after the NOTICE TO PROCEED, the <br />following work: <br /> <br />EMERGENCY WORK - 5TH AVENUE PUMP STATION <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto as described in Exhibit "A", attached hereto and incorporated <br />herein, signed by the Manager, Engineering and Construction of Redwood City, <br />which Documents are incorporated herein and made a part of this Agreement as if <br />herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Seven Hundred Twenty <br />Thousand and No/100 Dollars ($720,000.00) computed in accordance with <br />Contractor's accepted Proposal dated, August 18, 2005, which accepted Proposal <br />is incorporated herein by reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and <br />to the approval of, City or its authorized representative, and the work shall be done <br />in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to <br />1815, inclusive, of the California Labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each <br />worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than eight (8) hours in anyone (1) calendar day and 40 <br />hours in anyone (1) calendar week, unless such worker receives compensation for <br />all hours worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the prevailing <br />rate of per diem wages as determined by the Director of the California Department <br />of Industrial Relations. Pursuant to the provisions of California labor Code Section <br />1773.2, Contractor is hereby advised that copies of the prevailing rate of per diem <br /> <br />Atty/Agr/2005.064 <br />083105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.