My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RESO P-2377_Tariff No. 8 eff. July 1, 2018
RedwoodCity
>
City Clerk
>
Resolutions
>
Port Commission
>
2018
>
RESO P-2377_Tariff No. 8 eff. July 1, 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 3:10:37 PM
Creation date
5/30/2018 2:57:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Port Authority
Date
5/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Port of Redwood City - Tariff No. 8 <br />675 Seaport Boulevard <br />Redwood City, California 94063 <br />Phone: (650) 306-4150 Fax: (650) 369-7636 <br />I www.redwoodcityport.com <br />Exhibit "A" <br />Issued: May 23, 2018 <br />SECTION V - SERVICE AND FACILITIES <br />SERVICE AND FACILITIES CI -LARGE APPLICATION <br />13141h Revised Page 37 <br />Cancels - <br />121h Revised Page 37 <br />Correction No. 228247 <br />Effective: July 1, 2018 <br />(A) When stevedoring and terminal work are done by other than the Port of Redwood City, the <br />Service and Facilities Charge shall be assessed against the stevedore or contractor for the ship's <br />cargo handled through the Port's facilities. (See Note 1) <br />(B) The Service and Facilities Charge permits the movement of stevedoring equipment and <br />personnel onto and around the terminal areas to and from the vessel, provides for the use of <br />restroom area, temporary office space on the terminal and parking area for personnel working <br />the vessel and cargo and Port security. Full Service and Facilities Charges will apply once on all <br />cargo unloaded from a land carrier and removed by a land carrier at the Port's facilities. (See <br />Note 2). <br />(C) These charges are in addition to all other applicable charges in this Tariff. <br />Note 1: No Service and Facilities charge will be assessed against cargo in containers as defined in <br />Item 10. <br />Note 2: For all cargo received inbound, whether by land or ocean carrier at the Port's tank facility at <br />Berth 5, a single Service and Facilities charge will be assessed only at the time of the inbound <br />movement. <br />SERVICE AND FACILITIES CHARGE <br />Rates are based in dollars per 1,000 kilograms, or per cubic meter, according to vessel's manifest, <br />except as otherwise provided. <br />ARTICLES RATES <br />Cargo, dry or liquid, N.O.S $ 3:#7}M <br />Cargo, dry or liquid, in bulk, viz. <br />When handled through hopper or ship unloader system $ XO 1.75 <br />When handled through pipeline between vessel and shore facility $ x.(4.6868 <br />Scrap metal — to vessel over conveyor system $ —2-A9 <br />Scrap metal — N.O.S. $ 2 -18a -L9211 <br />Issued by: Port of Redwood City, Michael J. Giari, Port Manager <br />Item No. <br />500 <br />Item No. <br />501 (A) <br />RESO P-2377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.