My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt96 Rudolph & Sletten
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1996
>
Agmt96 Rudolph & Sletten
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2006 4:18:25 PM
Creation date
1/12/2006 4:12:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Rudolph & Sletten
PROJECT NAME
RWS fire station
RMP File Number
304
Date
10/2/1997
Reso Ref
12960 13045 13092 13093 13094
MO Ref
97-170 97-157 97-086
Box
6103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />R uno LPH 'SLETTEN IHe. <br /> <br />EXHIBIT B-1 <J <br /> <br />989 EAST HILLSDALE BLVD., SUITE #100 . POST OFFICE BOX 4637 . FOSTERCITY,CALIFORN1A94404 . (415)572-1919 <br /> <br />FIXED FEE PROPOSAL <br /> <br />We, the undersigned, propose to perform the pre-construction and general contracting services for <br />the city of Redwood City Redwood Shores Fire Station & Maintenance Facility project as <br />described in the project information data which has been attached and is dated September 1996. <br />We understand that neither the City of Redwood City nor its architect can guarantee the exact <br />design scope of work at this time. We understand the total project construction budget to be <br />approximately $1.6 million. <br /> <br />Fee and general conditions, calculated as a percentage, are proposed as follows: <br /> <br />PRE-CONSTRUCTION ACTIVITIES <br /> <br />$ 27.540.00 <br /> <br />FEE (inclusive of overhead and profit) <br /> <br />$80.000.00 <br /> <br />Number of full-time staff l..S <br /> <br />GENERAL CONDITIONS (include breakdown) <br /> <br />$172.020.00 <br /> <br />GENERAL CONDITIONS per week <br /> <br />$ 4,915.00 <br /> <br />Change Orders <br />ADDITIVE <br />Fee FIVE /5.0)% <br /> <br />FIVE (5.0)% <br /> <br />DEDUCTIVE <br />Fee ZERO (0.0)% <br /> <br />ZERO (0.0)% <br /> <br />The following agreements are made between Rudolph & Sletten, Inc. and the City of Redwood City <br />for the rendering of Construction Management/General Contractor services: <br /> <br />1. Should the actual guaranteed maximum contract cost vary in excess often percent (10%), an <br />amount based on the percent of the fixed fee quoted (to $1.6 million) will be added or deducted <br />to or from the above quoted fee. <br />2. Rudolph & Sletten, Inc. will provide pre-construction activities necessary to establish a <br />mutually agreed upon guaranteed maximum cost including mutually agreed upon contingency <br />and said fee prior to start of construction. <br />3. The above fee is valid for ninety (90) days from November 7,1996. <br />4. Rudolph & Sletten, Inc. will not change proposed team members during the entire project <br />without prior written approval of the City of Redwood City and possible financial penalty. <br /> <br /> <br />. ... <br /> <br />M tin Sisemore .~ <br />Vice President/Project Executive License 198069 <br />General and Engineering Contractors. Construction Managers <br />
The URL can be used to link to this page
Your browser does not support the video tag.