<br />AGREEMENT EXHIBIT 'D' - LISTING OF SUBCONTRACTORS - FINAL AGREED PRICE (FAP)
<br />
<br /> ITEM BID ITEM BID AMOUNT LOWEST RESPONSIBLE BIDDER
<br /> NO. DESCRIPTION R&S FAP SUBCONTRACTOR
<br /> 2.1 SURVEYING $10,220 ALLIED ENG'G CO.
<br /> 2.2 SITE PREPARATION $217,800 O'GRADY PAVING CO.
<br /> 2.2 ALTERNATE #1-5/12 PAVING C F .S. $12,700 O'GRADY PAVING CO.
<br /> 2.3 PAVEMENT MARKINGS $1,950 R.C. SHAY & CO. INC.
<br /> 2.4 SITE UTILITIES $103,575 HACKET PIPELINE, INC.
<br /> 2.6 IRRIGATION AND PLANTING $58,680 SHOOTER & BUTTS, INC.
<br /> 2.6 ALTERNATE #1 - ADDEND. #3 PLANTING $3,161 SHOOTER & BUTTS, INC.
<br /> 2,7 CONCRETE REINFORCING $47,097 McGRATH STEEL
<br /> 2,8 CONCRETE WORK $340,384 RUDOLPH & SLETTEN
<br /> 2.9 MASONRY $36,501 JOHN JACKSON MASONRY
<br /> 2,10 STEEL AND MISC. METAL $103,500 BOSTROM-BERGEN
<br /> 2.11 ROUGH CARPENTRY $258,966 RUDOLPH & SLETTEN
<br /> 2.11 ALTERNATE #1 - ROOF BATTENS $0 NOT REQUIRED
<br /> 2.11 ALTERNATE #2 - REDWOOD IN-LIEU OF D.FIR $9,300 RUDOLPH & SLETTEN
<br /> 2,12 FINISH CARPENTRY $55,780 B-K MILL & FIXTURE, INC.
<br /> 2.12 ALTERNATE #1 - ENTRY LOBBY COUNTER $4,200 B-K MILL & FIXTURE, INC.
<br /> 2.13 INSULATION $16,388 ALCAL ROOFING & INSUL.
<br /> 2.14 ROOFING $35,917 ALCAL ROOFING & INSUL.
<br /> 2.15 SHEET METAL $0 SEE ITEM 2.15 & 2.34 BELOW
<br /> 2.16 SUPPLY DOORS/FRAMES/HARDWARE $31,560 B-K MILL & FIXTURE, INC.
<br /> 2.16 INSTALL DOORS/FRAMES/HARDWARE $17,938 RUDOLPH & SLETTEN
<br /> 2.17 COILING/SECTIONAL DOOR $40,620 R&S ERECTION
<br /> 2.18 GLASS AND GLAZING $33,992 ROYAL GLASS CO.
<br /> 2.19 GYPSUM AND PLASTER $58,000 ROLLIE FRENCH
<br /> 2.19 ALTERNATE #1 - STUCCO INTGL. COLOR $0 NOT REQUIRED
<br /> 2.20 CERAMIC TILE $18,437 TILE WEST
<br /> 2.21 ACOUSTICAL CEILINGS $4,462 IRELAND INTERIOR SYS., INC.
<br /> 2.22 CARPET/RESILIENT FLOORING $23,437 B.T. MANCINI CO., INC.
<br /> 2.23 PAINTING $27,717 GEORGE E. MASKER, INC.
<br /> 2.23 ALTERNATE #1 - PAVEMENT STRIPPING $0 NOT REQUIRED
<br /> 2,23 ALTERNATE #2 - PAINT WOOD BATTENS $0 NOT REQUIRED
<br /> 2.23 ALTERNATE #3 - PAINT EXTERIOR STUCCO $1,413 GEORGE E. MASKER, INC.
<br /> 2.24 SUPPLY FLAGPOLE $1,900 KANE INTERIOR PROD.
<br /> 2.24 INSTALL FLAGPOLE $0 IN ITEM 2.8
<br /> 2.26 LOCKERS (COMBO SUPPLY/INSTALL) $13,110 NORTON (C.U CO., INC.
<br /> 2.30 BLINDS $1,240 DRAPERY CONCEPTS
<br /> 2.31 PRE-ENGINEERED BUILDING $150,905 METAL BUILDING CO.
<br /> 2.31 ALTERNATE #1 - 20 YEAR WARRANTY $0 NOT REQUIRED
<br /> 2.32 FIRE SPRINKLERS $32,338 SUPERIOR AUTOMATIC SPRINKLER
<br /> 2.33 PLUMBING $197,699 HELLWIG MECHANICAL
<br /> 2.34 HVAC $0 SEE ITEM 2.15 & 2.34 BELOW
<br />2.15 & 2.34 COMBO HVAC/SHEETMETAL $158,500 HELLWIG MECHANICAL
<br /> 2.35 ELECTRICAL $387 961 SASCO VALLEY ELECTRIC
<br /> K~::it'O S: $2,517,348
<br /> 2.25 SIGNAGE $15,000 ALLOWANCE - REBID
<br /> 2.27 RACK STORAGE $21,600 ALLOWANCE - REBID
<br /> 2.28 SPECIALTIES $14,377 ALLOWANCE - REBID
<br /> 2.29 EQUIPMENT $31 349 ALLOWANCE - REBID
<br /> SUBTOTAL OF REBID ALLOWANCE ITEMS: $82,326
<br /> SOIL STABILIZATION $7,000 ALLOWANCE
<br /> STEEL PROTECTION PLATES $2,000 ALLOWANCE
<br /> ADJUST EXISTING UTILITIES $6,000 ALLOWANCE
<br /> 2.5 FENCING $6,891 ALLOWANCE
<br /> , OF MISC. T ITEMS: '21,891
<br />LINE A SUBTOTAL ALL SUBCONTRACTORS BIDS & ALLOW'S $2,621,565
<br />B CONSTRUCTION FEE PER AGREEMENT $80,000
<br />C ADD'L FEE (BASED ON LINE A+G)"** $79,411
<br />D SUBTOTAL CM/GC'S FEE PER AGREEMENT: $159411
<br />E SUBTOTAL CONSTRUCTION COSTS PER CONTRACT: $2,780,976
<br />F
<br />G ADD CONTRACT CONTINGENCY C 5% OF LINE A $131,078
<br />H SUBTOTAL CONSTR COSTS + CONTINGENCY: $2,912,055
<br />I
<br />J PRECONSTRUCTION SERVICES PER AGREEMENT $27,540
<br />K ADD'L PRECONSTRUCTION SVCS - DELAYS/PRINTING $6,270
<br />L GENERAL CONDITIONS PER AGREEMENT - 35 WKS $172,020
<br />M ADD 2 WKS GENERAL CONDITIONS - SBSA SITE $9,830
<br />N ADD ALLOWANCE FOR INSU~ANCE, SUBJ. TO CITY APPROVA $27,426
<br />0 ADD PERFORMANCE BOND 0.80% OF LINE H $23,296
<br /> TOTAL FINAL AGREED PRICE IFAP) $3,178,437
<br />
<br />VALUE OF ORG/NAL APPROVED CMlGC AGREEMENT:
<br />PCIIHD/ACTIVEIFI REßTIBI DS] AP
<br />
<br />REVISED 05/16/1997 3:21 PM
<br />
<br />$279,560
<br />
<br />SHEET 1 OF 1